A platform for research: civil engineering, architecture and urbanism
Highway bridge drainage steel pipe construction method
The invention provides a highway bridge drainage steel pipe construction method, and belongs to the technical field of bridge drainage system construction. The method comprises the steps of S1 reserving holes and mounting a pad; S2 marking hole site numbers; S3 manufacturing a suspender; S4 arranging telescopic devices between bridge hanging pipe sections at the position of an expansion joint, and starting to install the first hanging pipe at the position of the expansion joint; S5 mounting the upper part of a hanger; S6 placing steel pipes in place; S7 installing the lower portion of the hanger; S8 moving to the next mounting position, and repeating the steps S5, S6 and S7; and S9 installing an elbow. According to the highway bridge drainage steel pipe construction method, the construction difficulty can be reduced, the construction process is simplified, and the construction cost is saved.
本发明提供一种公路桥梁排水钢管施工方法,属于桥梁排水系统施工的技术领域,包括S1、预留孔及安装垫板;S2、标记孔位号;S3、制作吊杆;S4、在伸缩缝位置于桥梁挂管节段间设置伸缩器,于伸缩缝位置开始安装首节挂管;S5、安装吊架上部;S6、钢管就位;S7、安装吊架下部;S8、移动至下一安装位,重复步骤S5、S6、S7;S9、安装弯头。本发明提供的公路桥梁排水钢管施工方法,可降低施工难度,简化施工过程,节约施工成本。
Highway bridge drainage steel pipe construction method
The invention provides a highway bridge drainage steel pipe construction method, and belongs to the technical field of bridge drainage system construction. The method comprises the steps of S1 reserving holes and mounting a pad; S2 marking hole site numbers; S3 manufacturing a suspender; S4 arranging telescopic devices between bridge hanging pipe sections at the position of an expansion joint, and starting to install the first hanging pipe at the position of the expansion joint; S5 mounting the upper part of a hanger; S6 placing steel pipes in place; S7 installing the lower portion of the hanger; S8 moving to the next mounting position, and repeating the steps S5, S6 and S7; and S9 installing an elbow. According to the highway bridge drainage steel pipe construction method, the construction difficulty can be reduced, the construction process is simplified, and the construction cost is saved.
本发明提供一种公路桥梁排水钢管施工方法,属于桥梁排水系统施工的技术领域,包括S1、预留孔及安装垫板;S2、标记孔位号;S3、制作吊杆;S4、在伸缩缝位置于桥梁挂管节段间设置伸缩器,于伸缩缝位置开始安装首节挂管;S5、安装吊架上部;S6、钢管就位;S7、安装吊架下部;S8、移动至下一安装位,重复步骤S5、S6、S7;S9、安装弯头。本发明提供的公路桥梁排水钢管施工方法,可降低施工难度,简化施工过程,节约施工成本。
Highway bridge drainage steel pipe construction method
一种公路桥梁排水钢管施工方法
LI TIANSHENG (author) / MA XIPING (author) / WEN HUI (author) / XU FENG (author) / GAO CHEN (author) / ZHANG DONG (author) / LIU YONGJUN (author) / SHI ZHEYU (author) / YIN BENXING (author)
2021-12-21
Patent
Electronic Resource
Chinese
IPC:
E01D
BRIDGES
,
Brücken
Built-in highway bridge drainage pipe cleaning device and cleaning method
European Patent Office | 2021
|Bridge floor anti-blocking drainage structure for highway bridge engineering construction
European Patent Office | 2023
|Handbook of steel drainage & highway construction products
TIBKAT | 1971
|