A platform for research: civil engineering, architecture and urbanism
Steel plate shear wall connecting method
The invention provides a steel plate shear wall connecting method. The steel plate shear wall connecting method comprises the steps that (1) an upper-section shear wall connecting piece is arranged on the side part of an upper-side shear wall; (2) a lower-section shear wall connecting piece is arranged on the side part of a lower-side shear wall, and the upper-section shear wall connecting piece and the lower-section shear wall connecting piece are oppositely arranged; and (3) the upper-section shear wall connecting piece and the lower-section shear wall connecting piece are connected together, so that the upper-side shear wall and the lower-side shear wall are connected together. The upper-section shear wall connecting piece is arranged on the side part of the upper-side shear wall, the lower-section shear wall connecting piece is arranged on the side part of the lower-side shear wall, and the upper-section shear wall connecting piece and the lower-section shear wall connecting piece are connected together, so that the upper-side shear wall and the lower-side shear wall are connected together. Connection construction of the steel plate shear walls is conducted in the mode, so that the connection speed between the steel plate shear walls can be greatly increased, and the construction efficiency is greatly improved.
本发明提出了一种钢板剪力墙连接方法,包括:步骤一:在上侧剪力墙的侧部设置一上段剪力墙连接件;步骤二:在下侧剪力墙的侧部设置一下段剪力墙连接件,所述上段剪力墙连接件和下段剪力墙连接件的设置位置相对设置;步骤三:将所述上段剪力墙连接件和下段剪力墙连接件连接在一起,以使得所述上侧剪力墙和下侧剪力墙连接在一起;通过在上侧剪力墙的侧部设置一上段剪力墙连接件,在下侧剪力墙的侧部设置一下段剪力墙连接件,并将所述上段剪力墙连接件和下段剪力墙连接件连接在一起,以使得所述上侧剪力墙和下侧剪力墙连接在一起。通过上述方式进行钢板剪力墙的连接施工,能够极大地提高钢板剪力墙之间的连接速度,极大地提高施工效率。
Steel plate shear wall connecting method
The invention provides a steel plate shear wall connecting method. The steel plate shear wall connecting method comprises the steps that (1) an upper-section shear wall connecting piece is arranged on the side part of an upper-side shear wall; (2) a lower-section shear wall connecting piece is arranged on the side part of a lower-side shear wall, and the upper-section shear wall connecting piece and the lower-section shear wall connecting piece are oppositely arranged; and (3) the upper-section shear wall connecting piece and the lower-section shear wall connecting piece are connected together, so that the upper-side shear wall and the lower-side shear wall are connected together. The upper-section shear wall connecting piece is arranged on the side part of the upper-side shear wall, the lower-section shear wall connecting piece is arranged on the side part of the lower-side shear wall, and the upper-section shear wall connecting piece and the lower-section shear wall connecting piece are connected together, so that the upper-side shear wall and the lower-side shear wall are connected together. Connection construction of the steel plate shear walls is conducted in the mode, so that the connection speed between the steel plate shear walls can be greatly increased, and the construction efficiency is greatly improved.
本发明提出了一种钢板剪力墙连接方法,包括:步骤一:在上侧剪力墙的侧部设置一上段剪力墙连接件;步骤二:在下侧剪力墙的侧部设置一下段剪力墙连接件,所述上段剪力墙连接件和下段剪力墙连接件的设置位置相对设置;步骤三:将所述上段剪力墙连接件和下段剪力墙连接件连接在一起,以使得所述上侧剪力墙和下侧剪力墙连接在一起;通过在上侧剪力墙的侧部设置一上段剪力墙连接件,在下侧剪力墙的侧部设置一下段剪力墙连接件,并将所述上段剪力墙连接件和下段剪力墙连接件连接在一起,以使得所述上侧剪力墙和下侧剪力墙连接在一起。通过上述方式进行钢板剪力墙的连接施工,能够极大地提高钢板剪力墙之间的连接速度,极大地提高施工效率。
Steel plate shear wall connecting method
钢板剪力墙连接方法
ZHANG JI (author) / CHEN HANGYU (author) / WANG TAO (author) / HE JIAN (author) / WANG HANG (author)
2021-12-21
Patent
Electronic Resource
Chinese
Steel frame-steel plate shear wall stress coordination type wall beam connecting joint
European Patent Office | 2022
|European Patent Office | 2022
|Connecting joint of steel plate composite shear wall and floor slab
European Patent Office | 2023
|