A platform for research: civil engineering, architecture and urbanism
Operation platform for waste water pump station
The invention discloses an operation platform for a waste water pump station. The operation platform comprises a barrel, a water inlet pipe is arranged on one side of the lower portion of the barrel, a water outlet pipe is arranged on one side of the upper portion of the barrel, an upper platform structure and a lower platform structure are arranged in the position, between the water inlet pipe and the water outlet pipe, in the barrel in an up-down distribution mode, the upper platform structure comprises a fixed platform plate and a movable platform plate, second supporting rings used for supporting the bottom edges of the fixed platform plate and the movable platform plate are fixedly arranged on the inner side wall of the barrel, the fixed platform plate and the movable platform plate are connected to each other in a hinged mode, and the fixed platform plate and the second supporting rings are fixedly connected to each other. The upper platform structure and the lower platform structure are arranged in an up-down layered mode, workers can conveniently maintain and check different heights in the barrel of the pump station according to needs, when the upper platform structure is opened, an electric telescopic rod matches with the movable platform plate, time and labor are saved, and the workers can conveniently conduct opening and closing operation.
本发明公开了一种污水泵站用操作站台,包括筒体,所述筒体下部一侧设置有进水管,所述筒体的上部一侧设置有出水管,位于进水管和出水管之间的所述筒体内上下分布设置有上站台结构和下站台结构;其中上站台结构包括定站板和动站板,所述筒体的内侧壁上固定设置有用于对定站板和动站板底部边沿进行支撑的第二支撑环,所述定站板和动站板彼此铰接,定站板与第二支撑环彼此固定连接,通过上站台结构和下站台结构上下分层设置,便于工作人员根据需要对泵站筒体内不同高度进行维修检查,且在打开上站台结构时,电动伸缩杆与动站板配合,省时省力,方便工作人员进行开合操作。
Operation platform for waste water pump station
The invention discloses an operation platform for a waste water pump station. The operation platform comprises a barrel, a water inlet pipe is arranged on one side of the lower portion of the barrel, a water outlet pipe is arranged on one side of the upper portion of the barrel, an upper platform structure and a lower platform structure are arranged in the position, between the water inlet pipe and the water outlet pipe, in the barrel in an up-down distribution mode, the upper platform structure comprises a fixed platform plate and a movable platform plate, second supporting rings used for supporting the bottom edges of the fixed platform plate and the movable platform plate are fixedly arranged on the inner side wall of the barrel, the fixed platform plate and the movable platform plate are connected to each other in a hinged mode, and the fixed platform plate and the second supporting rings are fixedly connected to each other. The upper platform structure and the lower platform structure are arranged in an up-down layered mode, workers can conveniently maintain and check different heights in the barrel of the pump station according to needs, when the upper platform structure is opened, an electric telescopic rod matches with the movable platform plate, time and labor are saved, and the workers can conveniently conduct opening and closing operation.
本发明公开了一种污水泵站用操作站台,包括筒体,所述筒体下部一侧设置有进水管,所述筒体的上部一侧设置有出水管,位于进水管和出水管之间的所述筒体内上下分布设置有上站台结构和下站台结构;其中上站台结构包括定站板和动站板,所述筒体的内侧壁上固定设置有用于对定站板和动站板底部边沿进行支撑的第二支撑环,所述定站板和动站板彼此铰接,定站板与第二支撑环彼此固定连接,通过上站台结构和下站台结构上下分层设置,便于工作人员根据需要对泵站筒体内不同高度进行维修检查,且在打开上站台结构时,电动伸缩杆与动站板配合,省时省力,方便工作人员进行开合操作。
Operation platform for waste water pump station
一种污水泵站用操作站台
ZHAO XINYI (author)
2021-12-24
Patent
Electronic Resource
Chinese
PUMP STATION FOR WASTE WATER AND INSERT FOR PUMP STATION
European Patent Office | 2015
|Water pump installation and maintenance platform of large pump station
European Patent Office | 2021
|