Hanging three-limb combined curtain wall main keel installation and construction method
The invention discloses a hanging three-limb combined curtain wall main keel installation and construction method. The hanging three-limb combined curtain wall main keel installation and construction method comprises the steps that a three-limb curtain wall main keel is assembled and formed on the ground; a whole component penetrates through the end of a cantilever truss through a tower crane or a crawler crane or a truck crane or other hoisting equipment by means of a double-shoulder-pole hoisting tool and then is hoisted to an installation position; and welding of a top joint is carried out, and the installation of the component is completed. According to the hanging three-limb combined curtain wall main keel installation and construction method, assembling in the air is not needed, assembling is conducted on the ground in advance, the component precision is easier to guarantee, high-altitude assembling operation is reduced, installation is stable, the safety is high, in addition, a shoulder pole does not need to be repeatedly installed and hoisted, the installation efficiency is improved, and the construction progress is accelerated.
本发明公开了一种吊挂三肢组合式幕墙主龙骨安装施工方法包括在地面将三肢幕墙主龙骨拼装成型,利用双扁担吊具,通过塔吊、履带吊或汽车吊等吊装设备,将整个构件从悬挑桁架端头穿过,然后吊运至安装部位,进行顶部节点的焊接,完成构件的安装。无需在空中拼装,事先在地面组装,构件精度更易保证,减少高空拼装作业,安装稳定,安全性高,此外无需重复安装吊装扁担,加快了安装效率,施工进度加快。
Hanging three-limb combined curtain wall main keel installation and construction method
The invention discloses a hanging three-limb combined curtain wall main keel installation and construction method. The hanging three-limb combined curtain wall main keel installation and construction method comprises the steps that a three-limb curtain wall main keel is assembled and formed on the ground; a whole component penetrates through the end of a cantilever truss through a tower crane or a crawler crane or a truck crane or other hoisting equipment by means of a double-shoulder-pole hoisting tool and then is hoisted to an installation position; and welding of a top joint is carried out, and the installation of the component is completed. According to the hanging three-limb combined curtain wall main keel installation and construction method, assembling in the air is not needed, assembling is conducted on the ground in advance, the component precision is easier to guarantee, high-altitude assembling operation is reduced, installation is stable, the safety is high, in addition, a shoulder pole does not need to be repeatedly installed and hoisted, the installation efficiency is improved, and the construction progress is accelerated.
本发明公开了一种吊挂三肢组合式幕墙主龙骨安装施工方法包括在地面将三肢幕墙主龙骨拼装成型,利用双扁担吊具,通过塔吊、履带吊或汽车吊等吊装设备,将整个构件从悬挑桁架端头穿过,然后吊运至安装部位,进行顶部节点的焊接,完成构件的安装。无需在空中拼装,事先在地面组装,构件精度更易保证,减少高空拼装作业,安装稳定,安全性高,此外无需重复安装吊装扁担,加快了安装效率,施工进度加快。
Hanging three-limb combined curtain wall main keel installation and construction method
一种吊挂三肢组合式幕墙主龙骨安装施工方法
YUAN LEIQIANG (author) / YAO ZHAO (author) / LI BIN (author) / HAO YONGPENG (author) / WANG FANGWEI (author) / YAO YONGYONG (author) / WEN JIANGFEI (author) / WEI CHANGSHENG (author)
2021-12-24
Patent
Electronic Resource
Chinese
Building curtain wall hanging keel frame and installation method
European Patent Office | 2024
|Building curtain wall keel frame installation construction method
European Patent Office | 2021
|Keel steel frame for fixing in dry-hanging installation of curtain wall stone
European Patent Office | 2020
|Light curtain wall keel assembly and installation method
European Patent Office | 2022
|