Stone dry hanging structure and stone dry hanging construction method
The invention discloses a stone dry hanging structure and a stone dry hanging construction method. At least one groove is formed in the back face of a stone plate, the stone dry hanging structure comprises at least one magnet block, a fixing piece and connecting pieces, and the magnet block is fixed in the groove of the stone plate; the fixing piece is installed on a wall, and a threaded end is reserved outside the wall. A connecting piece is installed at the threaded end of the fixing piece and used for being in magnetic connection with the magnet block so that the stone plate can be installed and fixed to the wall. According to the scheme, the stone plate can be conveniently and effectively temporarily fixed by using the magnet blocks, great convenience is provided for the early-stage adjustment stage, a convenient and rapid three-dimensional adjustment mechanism is provided for the stone dry hanging structure by using the connecting pieces and the magnet blocks, and the effect of installing stone in an extremely small space is achieved through the structure. More effective utilization space is provided for the indoor space, the production efficiency is improved, and the cost is reduced.
本发明公开了一种石材干挂结构及石材干挂施工方法,在石材板的背面开设至少一个凹槽,石材干挂结构包括:至少一个磁铁块、固定件和连接件,磁铁块固定在石材板的凹槽内;固定件安装在墙壁,并在墙壁外预留螺纹端;连接件安装在固定件的螺纹端,连接件用于与磁铁块磁性连接,以将石材板安装固定在墙壁。本方案通过使用磁铁块,能够方便有效的对石材板起到临时固定作用,为前期调整阶段提供巨大的便捷性,通过使用连接件和磁铁块,为该石材干挂结构提供了方便快捷的三维调整机制,该结构实现了极小空间安装石材的效果,为室内提供了更多的有效利用空间,提高了生产效率,减少了成本。
Stone dry hanging structure and stone dry hanging construction method
The invention discloses a stone dry hanging structure and a stone dry hanging construction method. At least one groove is formed in the back face of a stone plate, the stone dry hanging structure comprises at least one magnet block, a fixing piece and connecting pieces, and the magnet block is fixed in the groove of the stone plate; the fixing piece is installed on a wall, and a threaded end is reserved outside the wall. A connecting piece is installed at the threaded end of the fixing piece and used for being in magnetic connection with the magnet block so that the stone plate can be installed and fixed to the wall. According to the scheme, the stone plate can be conveniently and effectively temporarily fixed by using the magnet blocks, great convenience is provided for the early-stage adjustment stage, a convenient and rapid three-dimensional adjustment mechanism is provided for the stone dry hanging structure by using the connecting pieces and the magnet blocks, and the effect of installing stone in an extremely small space is achieved through the structure. More effective utilization space is provided for the indoor space, the production efficiency is improved, and the cost is reduced.
本发明公开了一种石材干挂结构及石材干挂施工方法,在石材板的背面开设至少一个凹槽,石材干挂结构包括:至少一个磁铁块、固定件和连接件,磁铁块固定在石材板的凹槽内;固定件安装在墙壁,并在墙壁外预留螺纹端;连接件安装在固定件的螺纹端,连接件用于与磁铁块磁性连接,以将石材板安装固定在墙壁。本方案通过使用磁铁块,能够方便有效的对石材板起到临时固定作用,为前期调整阶段提供巨大的便捷性,通过使用连接件和磁铁块,为该石材干挂结构提供了方便快捷的三维调整机制,该结构实现了极小空间安装石材的效果,为室内提供了更多的有效利用空间,提高了生产效率,减少了成本。
Stone dry hanging structure and stone dry hanging construction method
一种石材干挂结构及石材干挂施工方法
LIANG DONG (author) / LI JING (author) / RAO SUPING (author) / HUANG SILING (author) / BAI JUNFENG (author)
2021-12-24
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Stone dry hanging structure and stone dry hanging construction method
European Patent Office | 2021
|Stone dry-hanging fixing structure and stone dry-hanging rapid construction method
European Patent Office | 2024
|European Patent Office | 2022
|