Assembly method of offshore multi-barrel jacket foundation integrated transportation wharf
The invention belongs to the technical field of offshore wind power foundations, and discloses an assembly method of an offshore multi-barrel jacket foundation integrated transportation wharf. The assembly method comprises the following steps that a plurality of multi-barrel jacket foundations positioned on the shore of the wharf are hoisted through a transportation ship; and then the multi-barrel jacket foundations are put into water and fixedly connected with the transportation ship again, a tower barrel, a machine head and fan blades are sequentially hoisted through a wharf crane and assembled to the multi-barrel jacket foundations, and after assembly is completed, the transportation ship can directly conduct complete machine transportation on the nultiple multi-barrel jacket foundations. According to the assembly method of the offshore multi-barrel jacket foundation integrated transportation wharf, the requirement for the wharf crane and ship hoisting equipment is low, the wharf construction time is effectively shortened, the construction adaptability is good, and the construction cost can be greatly saved.
本发明属于海上风电基础技术领域,公开了一种海上多筒导管架基础一体化运输码头装配方法,通过运输船将位于码头岸边的多个多筒导管架基础起吊并与运输船进行固定连接,然后将各个多筒导管架基础下放入水并再次与运输船进行固定连接,再通过码头吊机依次吊装塔筒、机头及扇叶,装配至各个多筒导管架基础上,装配完成后可由运输船直接将多个多筒导管架基础进行整机运输。本发明对码头吊机及船舶吊装设备的要求较低,有效减少了码头施工时间,施工适应性良好,能够大幅节约施工成本。
Assembly method of offshore multi-barrel jacket foundation integrated transportation wharf
The invention belongs to the technical field of offshore wind power foundations, and discloses an assembly method of an offshore multi-barrel jacket foundation integrated transportation wharf. The assembly method comprises the following steps that a plurality of multi-barrel jacket foundations positioned on the shore of the wharf are hoisted through a transportation ship; and then the multi-barrel jacket foundations are put into water and fixedly connected with the transportation ship again, a tower barrel, a machine head and fan blades are sequentially hoisted through a wharf crane and assembled to the multi-barrel jacket foundations, and after assembly is completed, the transportation ship can directly conduct complete machine transportation on the nultiple multi-barrel jacket foundations. According to the assembly method of the offshore multi-barrel jacket foundation integrated transportation wharf, the requirement for the wharf crane and ship hoisting equipment is low, the wharf construction time is effectively shortened, the construction adaptability is good, and the construction cost can be greatly saved.
本发明属于海上风电基础技术领域,公开了一种海上多筒导管架基础一体化运输码头装配方法,通过运输船将位于码头岸边的多个多筒导管架基础起吊并与运输船进行固定连接,然后将各个多筒导管架基础下放入水并再次与运输船进行固定连接,再通过码头吊机依次吊装塔筒、机头及扇叶,装配至各个多筒导管架基础上,装配完成后可由运输船直接将多个多筒导管架基础进行整机运输。本发明对码头吊机及船舶吊装设备的要求较低,有效减少了码头施工时间,施工适应性良好,能够大幅节约施工成本。
Assembly method of offshore multi-barrel jacket foundation integrated transportation wharf
一种海上多筒导管架基础一体化运输码头装配方法
DING HONGYAN (author) / ZHANG PUYANG (author)
2021-12-28
Patent
Electronic Resource
Chinese
Automatic control system for offshore wind power multi-barrel jacket foundation
European Patent Office | 2021
|European Patent Office | 2021
|Jacket barrel type offshore wind power foundation with movable ballast
European Patent Office | 2024
|