Blocking and filling treatment method for air-raid shelter in pile foundation
The invention discloses a blocking and filling treatment method for an air-raid shelter in a pile foundation, and relates to the technical field of constructional engineering. The blocking and filling treatment method for the air-raid shelter in the pile foundation comprises an undisturbed soil layer, an underground air-raid shelter, a specially-made blocking air bag, a specially-made wall-protecting air bag 1, a bidirectional air valve, a bidirectional air pipe, a bidirectional air pump, a vertical guide hole, a foam concrete manufacturing device, a foam concrete guide pipe, a guide pipe hole and foam concrete. According to the blocking and filling treatment method for the air-raid shelter in the pile foundation, pile foundation construction can be implemented without heavy excavation treatment and pre-embedded steel pile casings, and the influence of excavation on surrounding buildings and the influence of the air-raid shelter on the use of a newly-built structure on the ground can be effectively avoided.
本发明公开了一种桩基遇防空洞的封堵填充处理方法,涉及建筑工程技术领域。该桩基遇防空洞的封堵填充处理方法,包括原状土层、地下防空洞、特制封堵气囊、特制护壁气囊1、双向空气阀门、双向空气管、双向空气泵、竖向引孔、泡沫混凝土制作装置、泡沫混凝土导管、导管孔和泡沫混凝土。该桩基遇防空洞的封堵填充处理方法,可以实现不需大开挖处理不需预埋钢护筒即可实施桩基施工,能有效避免开挖对周围建筑物的影响及防空洞对地上新建结构的使用造成影响。
Blocking and filling treatment method for air-raid shelter in pile foundation
The invention discloses a blocking and filling treatment method for an air-raid shelter in a pile foundation, and relates to the technical field of constructional engineering. The blocking and filling treatment method for the air-raid shelter in the pile foundation comprises an undisturbed soil layer, an underground air-raid shelter, a specially-made blocking air bag, a specially-made wall-protecting air bag 1, a bidirectional air valve, a bidirectional air pipe, a bidirectional air pump, a vertical guide hole, a foam concrete manufacturing device, a foam concrete guide pipe, a guide pipe hole and foam concrete. According to the blocking and filling treatment method for the air-raid shelter in the pile foundation, pile foundation construction can be implemented without heavy excavation treatment and pre-embedded steel pile casings, and the influence of excavation on surrounding buildings and the influence of the air-raid shelter on the use of a newly-built structure on the ground can be effectively avoided.
本发明公开了一种桩基遇防空洞的封堵填充处理方法,涉及建筑工程技术领域。该桩基遇防空洞的封堵填充处理方法,包括原状土层、地下防空洞、特制封堵气囊、特制护壁气囊1、双向空气阀门、双向空气管、双向空气泵、竖向引孔、泡沫混凝土制作装置、泡沫混凝土导管、导管孔和泡沫混凝土。该桩基遇防空洞的封堵填充处理方法,可以实现不需大开挖处理不需预埋钢护筒即可实施桩基施工,能有效避免开挖对周围建筑物的影响及防空洞对地上新建结构的使用造成影响。
Blocking and filling treatment method for air-raid shelter in pile foundation
一种桩基遇防空洞的封堵填充处理方法
HU SHANG (author) / HE ZHUANGZHUANG (author) / BI QIUYUN (author)
2021-12-31
Patent
Electronic Resource
Chinese
Filling device and method for waste air-raid shelter of pile foundation construction site
European Patent Office | 2021
|European Patent Office | 2022
|Engineering Index Backfile | 1939
Method for removing underground air-raid shelter and synchronously constructing foundation pit
European Patent Office | 2023
|Report on measurements of settlement of air raid shelter with concrete foundation
Engineering Index Backfile | 1950
|