The invention discloses a construction process of a ribbed floor system. The construction process comprises a supporting system construction stage, a formwork construction stage and a formwork dismantling stage. In the supporting system construction stage, fastening connection between n-shaped beams is achieved by adopting a special n-shaped beam structure and connecting pieces matched with the n-shaped beams. By means of the connecting mode, on one hand, the using amount of raw materials can be greatly reduced, and the construction cost is reduced; and on the other hand, the construction difficulty of workers can be reduced, and the construction efficiency is improved. In addition, in the formwork construction process, a formwork only needs to be directly placed in a grid formed by a supporting system, extra screws do not need to be driven, and other any fasteners do not need to be arranged to fix the formwork and ribbed beams, so that the time and energy of technicians are saved to a great extent, the efficiency of the formwork construction process is greatly improved, and the stability of the formwork is kept.
本申请公开了一种密肋楼盖的施工工艺,所述施工工艺包括支撑系统构建阶段、模壳施工阶段和模壳拆除阶段;在支撑系统构建阶段过程中,由于采用特殊的几字形梁结构和与几字形梁相适配的连接件,来实现各个几字形梁之间的紧固连接。这种连接方式一方面能够大大节省原材料的使用量,降低施工成本;另一方面能够降低工人的施工难度,提高施工效率。其次,在模壳施工过程中,本申请只需要将模壳直接放置于支撑系统所形成的栅格中即可,无需额外打螺钉,也无需设置其他任何紧固件对模壳和肋梁进行固定,不仅能够在很大程度上节省了技术人员的时间和精力,大大提升模壳施工过程的效率,还利于模壳稳定性的保持。
The invention discloses a construction process of a ribbed floor system. The construction process comprises a supporting system construction stage, a formwork construction stage and a formwork dismantling stage. In the supporting system construction stage, fastening connection between n-shaped beams is achieved by adopting a special n-shaped beam structure and connecting pieces matched with the n-shaped beams. By means of the connecting mode, on one hand, the using amount of raw materials can be greatly reduced, and the construction cost is reduced; and on the other hand, the construction difficulty of workers can be reduced, and the construction efficiency is improved. In addition, in the formwork construction process, a formwork only needs to be directly placed in a grid formed by a supporting system, extra screws do not need to be driven, and other any fasteners do not need to be arranged to fix the formwork and ribbed beams, so that the time and energy of technicians are saved to a great extent, the efficiency of the formwork construction process is greatly improved, and the stability of the formwork is kept.
本申请公开了一种密肋楼盖的施工工艺,所述施工工艺包括支撑系统构建阶段、模壳施工阶段和模壳拆除阶段;在支撑系统构建阶段过程中,由于采用特殊的几字形梁结构和与几字形梁相适配的连接件,来实现各个几字形梁之间的紧固连接。这种连接方式一方面能够大大节省原材料的使用量,降低施工成本;另一方面能够降低工人的施工难度,提高施工效率。其次,在模壳施工过程中,本申请只需要将模壳直接放置于支撑系统所形成的栅格中即可,无需额外打螺钉,也无需设置其他任何紧固件对模壳和肋梁进行固定,不仅能够在很大程度上节省了技术人员的时间和精力,大大提升模壳施工过程的效率,还利于模壳稳定性的保持。
Construction process of ribbed floor system
一种密肋楼盖的施工工艺
YANG YUJIE (author)
2021-12-31
Patent
Electronic Resource
Chinese
Fabricated multi-ribbed floor system template and multi-ribbed floor system construction method
European Patent Office | 2024
|Cinder block ribbed type floor slab construction
Engineering Index Backfile | 1928
|