A platform for research: civil engineering, architecture and urbanism
Embedded pile for geocell
The invention belongs to the technical field of geocells, and particularly relates to an embedded pile for a geocell. The embedded pile comprises a vertical stop lever and bent rods fixedly connected to two sides of the top of the vertical stop lever, a vertical groove is formed in the bottom of the vertical stop lever, an insertion pipe matched with the vertical groove is arranged in the vertical groove, a kidney-shaped hole is formed in the front side of the insertion pipe, and alignment holes are formed in the front sides of the bent rods. By arranging a bottom plate, the vertical stop lever and the insertion pipe, the embedded pile is mostly hollow, light in weight and convenient to carry, the heights of the bent rods are adjusted by pulling the vertical stop lever to move, high-performance expansive cement is poured into the insertion pipe through the alignment holes, water is injected into the insertion pipe through the alignment holes, the high-performance expansive cement after water injection is larger in weight, and the overall weight of the bottom plate is increased, so that the stability of the bottom plate is improved; and meanwhile, high-performance expansive cement is arranged in the insertion pipe and the vertical stop lever, the weight is increased, and meanwhile, the strength of the bottom plate can be obviously improved.
本发明属于土工格室技术领域,具体的说是一种用于土工格室的预埋桩,包括竖挡杆和固定连接在其顶部两侧的弯杆,所述竖挡杆底部开设有竖向槽,竖向槽内部设置有与其相匹配的插入管,插入管前侧开设有腰圆孔,所述弯杆前侧开设有对准孔;本发明通过底板、竖挡杆和插入管的设置,其大多为空心设置,重量较轻,方便搬运,通过拉动竖挡杆移动,调节弯杆的高度,并且通过对准孔向插入管内部灌入高性能膨胀水泥,通过对准孔向内部注水,注水后的高性能膨胀水泥重量更大,使底板的整体重量增加,从而提高了其稳定性,同时插入管内部和竖挡杆内部都有高性能膨胀水泥,提高重量的同时,能够明显提高其强度。
Embedded pile for geocell
The invention belongs to the technical field of geocells, and particularly relates to an embedded pile for a geocell. The embedded pile comprises a vertical stop lever and bent rods fixedly connected to two sides of the top of the vertical stop lever, a vertical groove is formed in the bottom of the vertical stop lever, an insertion pipe matched with the vertical groove is arranged in the vertical groove, a kidney-shaped hole is formed in the front side of the insertion pipe, and alignment holes are formed in the front sides of the bent rods. By arranging a bottom plate, the vertical stop lever and the insertion pipe, the embedded pile is mostly hollow, light in weight and convenient to carry, the heights of the bent rods are adjusted by pulling the vertical stop lever to move, high-performance expansive cement is poured into the insertion pipe through the alignment holes, water is injected into the insertion pipe through the alignment holes, the high-performance expansive cement after water injection is larger in weight, and the overall weight of the bottom plate is increased, so that the stability of the bottom plate is improved; and meanwhile, high-performance expansive cement is arranged in the insertion pipe and the vertical stop lever, the weight is increased, and meanwhile, the strength of the bottom plate can be obviously improved.
本发明属于土工格室技术领域,具体的说是一种用于土工格室的预埋桩,包括竖挡杆和固定连接在其顶部两侧的弯杆,所述竖挡杆底部开设有竖向槽,竖向槽内部设置有与其相匹配的插入管,插入管前侧开设有腰圆孔,所述弯杆前侧开设有对准孔;本发明通过底板、竖挡杆和插入管的设置,其大多为空心设置,重量较轻,方便搬运,通过拉动竖挡杆移动,调节弯杆的高度,并且通过对准孔向插入管内部灌入高性能膨胀水泥,通过对准孔向内部注水,注水后的高性能膨胀水泥重量更大,使底板的整体重量增加,从而提高了其稳定性,同时插入管内部和竖挡杆内部都有高性能膨胀水泥,提高重量的同时,能够明显提高其强度。
Embedded pile for geocell
一种用于土工格室的预埋桩
ZHAO SHUANG (author) / CHENG WEI (author)
2022-01-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen