A platform for research: civil engineering, architecture and urbanism
Combined shallow soft soil pile and large-pile-diameter deep pile foundation
The invention discloses a combined shallow soft soil pile and large-pile-diameter deep pile foundation in the field of civil engineering. The combined shallow soft soil pile and large-pile-diameter deep pile foundation comprises a butt joint sleeve, fastening rings, a pile body and a pile shoe; the top of the pile body is sleeved with the butt joint sleeve; the outer side of the pile body is sleeved with the fastening rings at equal intervals; reserved holes are formed in the outer side of the pile body in the circumferential direction at equal intervals; the bottom of the pile body is sleeved with an installation sleeve, and the pile shoe is welded to the bottom of the installation sleeve; a groove is formed in one side of the pile shoe, and a liquid inlet hole is formed in the groove; the outer surface layer of the pile body is coated with a stable coating; and a strip-shaped groove is formed in the outer side of the pile body in the axis direction. When the novel shallow soft soil pile and large-pile-diameter deep pile foundation is used in shallow soft soil, the butt joint sleeve is taken down, and upper structure construction is facilitated; when the novel shallow soft soil pile and large-pile-diameter deep pile foundation is used in a deep foundation, the pile body is connected in a butt joint manner through the butt joint sleeve, locking and fixing are conducted through locking bolts in locking holes, and the application range is effectively enlarged; and underground water can permeate into a hollow cavity conveniently through the liquid inlet hole, and the underground water can be pumped out and reduced conveniently through pumping equipment in the later period.
本发明公开了涉及土木工程领域的组合式浅层软土桩和大桩径深桩桩基,包括对接套、紧固环、桩体和桩靴,桩体的顶部套设有对接套,桩体的外侧等距离套设有紧固环,桩体的外侧沿圆周方向等距离开设有预留孔,桩体的底部套设有安装套且安装套的底部焊接有桩靴,桩靴的一侧设置有凹槽且凹槽内开设有进液孔,桩体的外表层喷涂有稳定涂层,桩体的外侧沿轴心线方向设置有条形槽;该新型浅层软土桩和大桩径深桩桩基在浅层软土内使用时取下对接套便于上部结构施工,当在深层地基中时,利用对接套对接桩体,并且通过锁紧孔内的锁紧螺栓进行锁紧固定,有效的扩大使用范围,利用进液孔便于使地下水渗入到中空腔内,便于后续用抽水设备抽出降低地下水。
Combined shallow soft soil pile and large-pile-diameter deep pile foundation
The invention discloses a combined shallow soft soil pile and large-pile-diameter deep pile foundation in the field of civil engineering. The combined shallow soft soil pile and large-pile-diameter deep pile foundation comprises a butt joint sleeve, fastening rings, a pile body and a pile shoe; the top of the pile body is sleeved with the butt joint sleeve; the outer side of the pile body is sleeved with the fastening rings at equal intervals; reserved holes are formed in the outer side of the pile body in the circumferential direction at equal intervals; the bottom of the pile body is sleeved with an installation sleeve, and the pile shoe is welded to the bottom of the installation sleeve; a groove is formed in one side of the pile shoe, and a liquid inlet hole is formed in the groove; the outer surface layer of the pile body is coated with a stable coating; and a strip-shaped groove is formed in the outer side of the pile body in the axis direction. When the novel shallow soft soil pile and large-pile-diameter deep pile foundation is used in shallow soft soil, the butt joint sleeve is taken down, and upper structure construction is facilitated; when the novel shallow soft soil pile and large-pile-diameter deep pile foundation is used in a deep foundation, the pile body is connected in a butt joint manner through the butt joint sleeve, locking and fixing are conducted through locking bolts in locking holes, and the application range is effectively enlarged; and underground water can permeate into a hollow cavity conveniently through the liquid inlet hole, and the underground water can be pumped out and reduced conveniently through pumping equipment in the later period.
本发明公开了涉及土木工程领域的组合式浅层软土桩和大桩径深桩桩基,包括对接套、紧固环、桩体和桩靴,桩体的顶部套设有对接套,桩体的外侧等距离套设有紧固环,桩体的外侧沿圆周方向等距离开设有预留孔,桩体的底部套设有安装套且安装套的底部焊接有桩靴,桩靴的一侧设置有凹槽且凹槽内开设有进液孔,桩体的外表层喷涂有稳定涂层,桩体的外侧沿轴心线方向设置有条形槽;该新型浅层软土桩和大桩径深桩桩基在浅层软土内使用时取下对接套便于上部结构施工,当在深层地基中时,利用对接套对接桩体,并且通过锁紧孔内的锁紧螺栓进行锁紧固定,有效的扩大使用范围,利用进液孔便于使地下水渗入到中空腔内,便于后续用抽水设备抽出降低地下水。
Combined shallow soft soil pile and large-pile-diameter deep pile foundation
组合式浅层软土桩和大桩径深桩桩基
ZHOU LI (author) / ZHOU CHUCHUN (author) / CHEN TENGLONG (author) / ZHOU XINGZHONG (author) / ZHOU ZHUJUN (author)
2022-01-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Large-diameter pile foundation pile head chiseling device
European Patent Office | 2023
|Large-diameter pile foundation pile head chiseling device
European Patent Office | 2024
|European Patent Office | 2024
|European Patent Office | 2024
|Soft soil foundation pile group half-branch pile foundation technology
European Patent Office | 2021
|