Advanced water stop pouring construction method
The invention discloses an advanced water stop pouring construction method, and relates to the field of advanced water stop. According to the technical scheme, the method comprises the following steps that S1, construction of a protective layer, water prevention and pits is conducted; S2, a front half advanced water stop mesh is installed, and supporting steel bars are utilized to extend downwards to the pits for fixing; S3, h-shaped fixing pieces are fixed, the lower ends of the h-shaped fixing pieces extend into the pits, and sandwich foam boards are installed; S4, front half concrete is poured; S5, according to the front half advanced water stop, a water stop mesh, supporting steel bars and h-shaped fixing pieces of a rear half advanced water stop are installed; and S6, rear half concrete is poured. The supporting steel bars and the h-shaped fixing pieces are matched to the pits to position construction, position deviation in the construction process is avoided, and the construction precision and efficiency can be remarkably improved.
本发明公开了一种超前止水浇筑施工方法,涉及超前止水领域,本发明的技术方案包括如下步骤:S1,保护层、防水、凹坑施工;S2,安装前半幅超前止水网片,利用支撑钢筋向下延伸至凹坑固定;S3,固定h型固定片,h型固定片的下端延伸至凹坑内,安装夹心泡沫板;S4,浇筑前半幅砼;S5,按照前半幅超前止水,安装后半幅超前止水的止水网片、支撑钢筋和h型固定片;S6,浇筑后半幅砼。利用支撑钢筋和h型固定片配合至凹坑,以对施工进行定位,避免在施工过程中出现位置偏移,能够显著提高施工精度和效率。
Advanced water stop pouring construction method
The invention discloses an advanced water stop pouring construction method, and relates to the field of advanced water stop. According to the technical scheme, the method comprises the following steps that S1, construction of a protective layer, water prevention and pits is conducted; S2, a front half advanced water stop mesh is installed, and supporting steel bars are utilized to extend downwards to the pits for fixing; S3, h-shaped fixing pieces are fixed, the lower ends of the h-shaped fixing pieces extend into the pits, and sandwich foam boards are installed; S4, front half concrete is poured; S5, according to the front half advanced water stop, a water stop mesh, supporting steel bars and h-shaped fixing pieces of a rear half advanced water stop are installed; and S6, rear half concrete is poured. The supporting steel bars and the h-shaped fixing pieces are matched to the pits to position construction, position deviation in the construction process is avoided, and the construction precision and efficiency can be remarkably improved.
本发明公开了一种超前止水浇筑施工方法,涉及超前止水领域,本发明的技术方案包括如下步骤:S1,保护层、防水、凹坑施工;S2,安装前半幅超前止水网片,利用支撑钢筋向下延伸至凹坑固定;S3,固定h型固定片,h型固定片的下端延伸至凹坑内,安装夹心泡沫板;S4,浇筑前半幅砼;S5,按照前半幅超前止水,安装后半幅超前止水的止水网片、支撑钢筋和h型固定片;S6,浇筑后半幅砼。利用支撑钢筋和h型固定片配合至凹坑,以对施工进行定位,避免在施工过程中出现位置偏移,能够显著提高施工精度和效率。
Advanced water stop pouring construction method
一种超前止水浇筑施工方法
YU ZHENGBING (author) / LIN LI (author) / LIU YACHAO (author) / HU JIAYIN (author) / PENG BO (author)
2022-01-04
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2023
|European Patent Office | 2015
|Construction method guaranteeing pouring formation of toilet water-stop ridge platform
European Patent Office | 2015
|One-time pouring construction method for hydraulic dam side water stop steel plate
European Patent Office | 2020
|Improved post-pouring strip advanced water-stopping construction method
European Patent Office | 2015
|