Waterproof, moisture-proof and mildew-proof construction process for indoor floor
The invention discloses a waterproof, moisture-proof and mildew-proof construction process for an indoor floor. The waterproof, moisture-proof and mildew-proof construction process comprises the following steps that S1, a base layer is cleaned; S2, whether the ground is mildewed or not is checked, and thorough mildew removal treatment is carried out on the ground; S3, a water blocking layer is laid on the base layer, the surface of the water blocking layer is connected with the surface of the base layer in an attached mode, and the peripheral ends of the water blocking layer are laid to the wall connected with the base layer; S4, sealing primer is evenly brushed on the surface of the base layer, and protective primer is brushed on the sealing primer; S5, after all the protective primer is dried, a waterproof coiled material is cut according to the laying length and rolled for standby application, and then the waterproof coiled material to be laid is subjected to hot melting treatment; S6, after the surface of the waterproof coiled material is subjected to hot melting, the waterproof coiled material is immediately laid to the ground base layer; S7, a double-layer waterproof coiled material is laid on an indoor weak part which is prone to causing water leakage; and S8, edge sealing treatment is carried out on transverse and vertical joints of the waterproof coiled material. The waterproof, moisture-proof and mildew-proof performance of the indoor floor is greatly improved.
本发明公开了一种室内地面防水防潮防霉施工工艺,包括以下步骤:S1:先对基层进行清理;S2:检查地面是否出现霉变情况,对其进行彻底的除霉处理;S3:在基层上铺设阻水层,阻水层的表面与基层的表面贴合连接,阻水层的四周端部均铺设至与基层连接的墙体上;S4:在基层表面均匀涂刷封闭底漆,在封闭底漆上涂刷防护底胶;S5:待所有防护底胶干燥后,将防水卷材按铺贴长度进行裁剪并卷好备用,然后对待铺设的防水卷材进行热熔处理;S6:当防水卷材表面热熔后,立即将防水卷材铺设至地面基层;S7:对室内容易漏水的薄弱部位铺设双层防水卷材;S8:对防水卷材的横竖接头处进行封边处理。本发明大大提高了室内地面的防水防潮防霉性能。
Waterproof, moisture-proof and mildew-proof construction process for indoor floor
The invention discloses a waterproof, moisture-proof and mildew-proof construction process for an indoor floor. The waterproof, moisture-proof and mildew-proof construction process comprises the following steps that S1, a base layer is cleaned; S2, whether the ground is mildewed or not is checked, and thorough mildew removal treatment is carried out on the ground; S3, a water blocking layer is laid on the base layer, the surface of the water blocking layer is connected with the surface of the base layer in an attached mode, and the peripheral ends of the water blocking layer are laid to the wall connected with the base layer; S4, sealing primer is evenly brushed on the surface of the base layer, and protective primer is brushed on the sealing primer; S5, after all the protective primer is dried, a waterproof coiled material is cut according to the laying length and rolled for standby application, and then the waterproof coiled material to be laid is subjected to hot melting treatment; S6, after the surface of the waterproof coiled material is subjected to hot melting, the waterproof coiled material is immediately laid to the ground base layer; S7, a double-layer waterproof coiled material is laid on an indoor weak part which is prone to causing water leakage; and S8, edge sealing treatment is carried out on transverse and vertical joints of the waterproof coiled material. The waterproof, moisture-proof and mildew-proof performance of the indoor floor is greatly improved.
本发明公开了一种室内地面防水防潮防霉施工工艺,包括以下步骤:S1:先对基层进行清理;S2:检查地面是否出现霉变情况,对其进行彻底的除霉处理;S3:在基层上铺设阻水层,阻水层的表面与基层的表面贴合连接,阻水层的四周端部均铺设至与基层连接的墙体上;S4:在基层表面均匀涂刷封闭底漆,在封闭底漆上涂刷防护底胶;S5:待所有防护底胶干燥后,将防水卷材按铺贴长度进行裁剪并卷好备用,然后对待铺设的防水卷材进行热熔处理;S6:当防水卷材表面热熔后,立即将防水卷材铺设至地面基层;S7:对室内容易漏水的薄弱部位铺设双层防水卷材;S8:对防水卷材的横竖接头处进行封边处理。本发明大大提高了室内地面的防水防潮防霉性能。
Waterproof, moisture-proof and mildew-proof construction process for indoor floor
一种室内地面防水防潮防霉施工工艺
PENG LINJUN (author) / ZHANG BO (author) / XU YANYING (author) / SHEN FEI (author) / ZHENG ENZE (author)
2022-01-04
Patent
Electronic Resource
Chinese
Waterproof, moisture-proof and mildew-proof construction process for basement
European Patent Office | 2023
|Stadium moisture-proof and mildew-proof sports wood floor
European Patent Office | 2022
|