A platform for research: civil engineering, architecture and urbanism
Asphaltic sand water retaining belt repairing and heightening construction process
The invention relates to an asphaltic sand water retaining belt repairing and heightening construction process, and belongs to the technical field of water retaining belt construction. The process comprises the following steps: step a, conducting raw material detection and target ratio optimization; step b, mixing and transporting asphaltic sand; c, carrying out construction lofting, and drawing a walking indication line on a surface layer according to measurement marks; step d, cleaning a water retaining belt at the position needing to be constructed, and subjecting the disease position section of the water retaining belt and the front and rear position sections of the disease position to chiseling treatment and cleaning; step e, a using a repairing device for repairing the water retaining belt along the walking indication line; step f, conducting water blocking belt joint treatment; and step g, detecting the quality of the asphaltic sand water retaining belt. The method has the advantages that the water retaining belt repairing efficiency can be improved, and the construction efficiency of construction can be improved.
本申请涉及一种沥青砂拦水带修复、加高施工工艺,属于拦水带施工的技术领域,其包括如下步骤:步骤a:原材料检测及目标配比优化;步骤b:沥青砂的拌和及运输;步骤c:施工放样,按测量标记在面层上画出行走指示线;步骤d:对所需施工位置的拦水带进行清洁处理,将拦水带病害位置段以及病害位置的前后位置段进行凿毛处理并清扫干净;步骤e:使用修复装置沿行走指示线进行拦水带修复作业;步骤f:拦水带接缝处理;步骤g:进行沥青砂拦水带质量检测。本申请具有能提高拦水带修复、加高施工的施工效率的优点。
Asphaltic sand water retaining belt repairing and heightening construction process
The invention relates to an asphaltic sand water retaining belt repairing and heightening construction process, and belongs to the technical field of water retaining belt construction. The process comprises the following steps: step a, conducting raw material detection and target ratio optimization; step b, mixing and transporting asphaltic sand; c, carrying out construction lofting, and drawing a walking indication line on a surface layer according to measurement marks; step d, cleaning a water retaining belt at the position needing to be constructed, and subjecting the disease position section of the water retaining belt and the front and rear position sections of the disease position to chiseling treatment and cleaning; step e, a using a repairing device for repairing the water retaining belt along the walking indication line; step f, conducting water blocking belt joint treatment; and step g, detecting the quality of the asphaltic sand water retaining belt. The method has the advantages that the water retaining belt repairing efficiency can be improved, and the construction efficiency of construction can be improved.
本申请涉及一种沥青砂拦水带修复、加高施工工艺,属于拦水带施工的技术领域,其包括如下步骤:步骤a:原材料检测及目标配比优化;步骤b:沥青砂的拌和及运输;步骤c:施工放样,按测量标记在面层上画出行走指示线;步骤d:对所需施工位置的拦水带进行清洁处理,将拦水带病害位置段以及病害位置的前后位置段进行凿毛处理并清扫干净;步骤e:使用修复装置沿行走指示线进行拦水带修复作业;步骤f:拦水带接缝处理;步骤g:进行沥青砂拦水带质量检测。本申请具有能提高拦水带修复、加高施工的施工效率的优点。
Asphaltic sand water retaining belt repairing and heightening construction process
一种沥青砂拦水带修复、加高施工工艺
WANG LIANFANG (author) / HOU YONGSHENG (author) / YOU WEIFENG (author) / ZHANG NAIQI (author) / HU YANMIN (author) / LIANG LIANG (author) / LYU JUNJUN (author) / LIU XIONGWEI (author) / SUN BIN (author) / HU JINGUI (author)
2022-01-07
Patent
Electronic Resource
Chinese
Construction method for rapidly heightening water retaining sub-weir of cofferdam
European Patent Office | 2024
|European Patent Office | 2020
|Method for heightening and reinforcing gravity retaining wall
European Patent Office | 2024
|European Patent Office | 2023
|