Foundation pit concrete enclosing purlin and support rapid dismantling construction method
The invention relates to a foundation pit concrete enclosing purlin and support rapid dismantling construction method. The method comprises the following five steps that 1, before the concrete enclosing purlin and the support are constructed, a separation sleeve is pre-buried between the concrete enclosing purlin and a pile foundation, and segmented sleeves are pre-buried in the concrete enclosing purlin and the support at the same time; 2, prefabricated hanging rings are installed at the positions of the upper tops of the concrete enclosing purlins and the supports, and the prefabricated hanging rings are embedded before the concrete enclosing purlins and the supports are poured; 3, before the concrete enclosing purlins and the supports are dismantled, scaffolds are erected below the concrete enclosing purlins; 4, during dismantling, splitters of a plurality of hydraulic splitting machines need to be placed into a plurality of adjacent separation sleeves and the corresponding segmented sleeves; and 5, after the scaffold is erected, when the concrete enclosing purlins and the supports are dismantled, lifting hooks of an automobile crane need to be clamped into the corresponding prefabricated hanging rings, the whole body is lifted out and transported outwards after the concrete enclosing purlins and the supports are dismantled in a segmented mode, dust, noise and vibration can be avoided in the dismantling process, and dismantling is safer and more efficient while the field operation intensity is reduced.
本发明涉及一种基坑混凝土围檩及支撑快速拆除施工方法,该方法包括五个步骤,步骤一:施作混凝土围檩及支撑前,在混凝土围檩与桩基之间预埋分离套管,同时在混凝土围檩内和支撑内预埋分段套管;步骤二:在混凝土围檩及支撑上顶部的位置安装预制吊环,并在混凝土围檩及支撑浇筑之前埋入;步骤三:拆除混凝土围檩及支撑前,在混凝土围檩下方搭设脚手架;步骤四:拆除时需先将多个液压劈裂机的分裂器放入多个相邻的分离套管和对应的各分段套管内;步骤五:脚手架搭设完成后,拆除混凝土围檩及支撑时,需将汽车吊吊勾卡入对应的预制吊环内,分段拆除后整体吊出外运,拆除过程中可避免产生粉尘、噪音、振动,降低现场作业强度的同时使拆除更安全高效。
Foundation pit concrete enclosing purlin and support rapid dismantling construction method
The invention relates to a foundation pit concrete enclosing purlin and support rapid dismantling construction method. The method comprises the following five steps that 1, before the concrete enclosing purlin and the support are constructed, a separation sleeve is pre-buried between the concrete enclosing purlin and a pile foundation, and segmented sleeves are pre-buried in the concrete enclosing purlin and the support at the same time; 2, prefabricated hanging rings are installed at the positions of the upper tops of the concrete enclosing purlins and the supports, and the prefabricated hanging rings are embedded before the concrete enclosing purlins and the supports are poured; 3, before the concrete enclosing purlins and the supports are dismantled, scaffolds are erected below the concrete enclosing purlins; 4, during dismantling, splitters of a plurality of hydraulic splitting machines need to be placed into a plurality of adjacent separation sleeves and the corresponding segmented sleeves; and 5, after the scaffold is erected, when the concrete enclosing purlins and the supports are dismantled, lifting hooks of an automobile crane need to be clamped into the corresponding prefabricated hanging rings, the whole body is lifted out and transported outwards after the concrete enclosing purlins and the supports are dismantled in a segmented mode, dust, noise and vibration can be avoided in the dismantling process, and dismantling is safer and more efficient while the field operation intensity is reduced.
本发明涉及一种基坑混凝土围檩及支撑快速拆除施工方法,该方法包括五个步骤,步骤一:施作混凝土围檩及支撑前,在混凝土围檩与桩基之间预埋分离套管,同时在混凝土围檩内和支撑内预埋分段套管;步骤二:在混凝土围檩及支撑上顶部的位置安装预制吊环,并在混凝土围檩及支撑浇筑之前埋入;步骤三:拆除混凝土围檩及支撑前,在混凝土围檩下方搭设脚手架;步骤四:拆除时需先将多个液压劈裂机的分裂器放入多个相邻的分离套管和对应的各分段套管内;步骤五:脚手架搭设完成后,拆除混凝土围檩及支撑时,需将汽车吊吊勾卡入对应的预制吊环内,分段拆除后整体吊出外运,拆除过程中可避免产生粉尘、噪音、振动,降低现场作业强度的同时使拆除更安全高效。
Foundation pit concrete enclosing purlin and support rapid dismantling construction method
一种基坑混凝土围檩及支撑快速拆除施工方法
WANG WENZHANG (author) / ZHANG WENMING (author) / MO JIANGFENG (author) / SHEN YAN (author) / HAN MINGTAO (author) / GAO YUJIA (author) / WANG HUAIBIN (author) / LIU TAO (author) / ZHANG ZHAOXIN (author) / FENG YUNAN (author)
2022-01-07
Patent
Electronic Resource
Chinese
Steel enclosing purlin dismantling device and construction method thereof
European Patent Office | 2020
|Turnover enclosing purlin for foundation pit anchor cable support
European Patent Office | 2021
|Construction method of detachable steel enclosing purlin support
European Patent Office | 2024
|Construction method and construction system of foundation pit enclosing purlin
European Patent Office | 2024
|