High abrupt slope pile foundation reinforcing method
The invention relates to the technical field of bridge engineering and discloses a high abrupt slope pile foundation reinforcing method. The high abrupt slope pile foundation reinforcing method comprises the following steps of pile foundation construction, reinforcing pile construction, reinforcing plate installation and slope protection construction, and the reinforcing plate is used for applying force towards the abrupt slope direction to the pile foundation. According to the construction method, pile foundation construction, reinforcing pile construction and reinforcing plate installation are arranged, the reinforcing piles are used for supporting the reinforcing plates, the reinforcing plates are used for applying force in the abrupt slope direction to the pile foundations, and then the pile foundations have the trend of moving in the abrupt slope direction, so that the pile foundations have the force of resisting debris flow, and the stability of the pile foundations is improved.
本申请涉及桥梁工程的技术领域公开了一种高陡坡桩基加固方法,其包括以下步骤,桩基施工、加固桩施工、加固板安装和护坡施工,加固板用于对桩基施加朝向陡坡方向的力。本申请通过设置桩基施工、加固桩施工和加固板安装,加固桩用于对加固板进行支撑,加固板用于对桩基施加朝向陡坡方向的力,继而使得桩基具有朝向陡坡方向运动的趋势,从而使得桩基具有抗拒泥石流的力,进而增加桩基的稳定性。
High abrupt slope pile foundation reinforcing method
The invention relates to the technical field of bridge engineering and discloses a high abrupt slope pile foundation reinforcing method. The high abrupt slope pile foundation reinforcing method comprises the following steps of pile foundation construction, reinforcing pile construction, reinforcing plate installation and slope protection construction, and the reinforcing plate is used for applying force towards the abrupt slope direction to the pile foundation. According to the construction method, pile foundation construction, reinforcing pile construction and reinforcing plate installation are arranged, the reinforcing piles are used for supporting the reinforcing plates, the reinforcing plates are used for applying force in the abrupt slope direction to the pile foundations, and then the pile foundations have the trend of moving in the abrupt slope direction, so that the pile foundations have the force of resisting debris flow, and the stability of the pile foundations is improved.
本申请涉及桥梁工程的技术领域公开了一种高陡坡桩基加固方法,其包括以下步骤,桩基施工、加固桩施工、加固板安装和护坡施工,加固板用于对桩基施加朝向陡坡方向的力。本申请通过设置桩基施工、加固桩施工和加固板安装,加固桩用于对加固板进行支撑,加固板用于对桩基施加朝向陡坡方向的力,继而使得桩基具有朝向陡坡方向运动的趋势,从而使得桩基具有抗拒泥石流的力,进而增加桩基的稳定性。
High abrupt slope pile foundation reinforcing method
一种高陡坡桩基加固方法
WANG SHENGZHI (author) / WAN YUFAN (author) / WAN SHAOWEN (author) / ZHENG CHAO (author) / SUN DELIN (author) / LIU BENLI (author) / LI WEIJIAN (author) / LI ZHENHUA (author) / ZHANG YANQI (author) / WU JUMIN (author)
2022-01-14
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method for pile group foundation of bridge in abrupt slope terrain
European Patent Office | 2023
|