A platform for research: civil engineering, architecture and urbanism
Device for distributing weight of flue on building body
The invention discloses a device for distributing the weight of a flue on a building body. The device comprises an angular fixing piece, a connecting plate is hinged to the opposite outer side surface of the angular fixing piece, an angular locking piece corresponding to the angular fixing piece up and down is hinged to the upper end of the connecting plate, the angular fixing piece is locked on the outer wall of the flue through a hoop, a stretching rod for enabling the connecting plate to rotate around the angular fixing piece and secondarily locking the angular locking piece on the outer wall of the flue is arranged between one side, far away from the angular fixing piece, of the relative lower end of the connecting plate and the building body. The angle-shaped fixing piece is locked on the outer wall of the flue through the hoop, then the connecting plate is pulled through the stretching rod, then the angle-shaped locking piece is secondarily locked on the outer wall of the flue, therefore the weight of the flue body is dispersed to a building body of a specific floor, the problem that an existing flue needs to be supported by a bearing piece, and grout leakage, grout exposure, untight sealing and the like occurs in the later grouting process are solved.
本发明公开了一种将烟气道重量分布在楼体上的装置,包括角形固定件,所述角形固定件的相对外侧面上铰接有连接板,所述连接板的上端铰接有与角形固定件上下对应的角形锁定件,所述角形固定件通过抱箍锁定在烟气道外壁上,所述连接板相对下端远离角形固定件一侧与楼体之间设有使连接板绕角形固定件转动并将角形锁定件二次锁定在烟气道外壁上的拉伸杆。本发明通过抱箍将角形固定件锁定在烟气道外壁上,再通过拉伸杆拉动连接板进而将角形锁定件二次锁定在烟气道外壁上,从而将烟气道本体重量分散到特定楼层的楼体上,彻底解决现有的烟气道需要承托件支撑,造成后期灌浆过程中易出现漏浆、露浆、密封不严等问题。
Device for distributing weight of flue on building body
The invention discloses a device for distributing the weight of a flue on a building body. The device comprises an angular fixing piece, a connecting plate is hinged to the opposite outer side surface of the angular fixing piece, an angular locking piece corresponding to the angular fixing piece up and down is hinged to the upper end of the connecting plate, the angular fixing piece is locked on the outer wall of the flue through a hoop, a stretching rod for enabling the connecting plate to rotate around the angular fixing piece and secondarily locking the angular locking piece on the outer wall of the flue is arranged between one side, far away from the angular fixing piece, of the relative lower end of the connecting plate and the building body. The angle-shaped fixing piece is locked on the outer wall of the flue through the hoop, then the connecting plate is pulled through the stretching rod, then the angle-shaped locking piece is secondarily locked on the outer wall of the flue, therefore the weight of the flue body is dispersed to a building body of a specific floor, the problem that an existing flue needs to be supported by a bearing piece, and grout leakage, grout exposure, untight sealing and the like occurs in the later grouting process are solved.
本发明公开了一种将烟气道重量分布在楼体上的装置,包括角形固定件,所述角形固定件的相对外侧面上铰接有连接板,所述连接板的上端铰接有与角形固定件上下对应的角形锁定件,所述角形固定件通过抱箍锁定在烟气道外壁上,所述连接板相对下端远离角形固定件一侧与楼体之间设有使连接板绕角形固定件转动并将角形锁定件二次锁定在烟气道外壁上的拉伸杆。本发明通过抱箍将角形固定件锁定在烟气道外壁上,再通过拉伸杆拉动连接板进而将角形锁定件二次锁定在烟气道外壁上,从而将烟气道本体重量分散到特定楼层的楼体上,彻底解决现有的烟气道需要承托件支撑,造成后期灌浆过程中易出现漏浆、露浆、密封不严等问题。
Device for distributing weight of flue on building body
一种将烟气道重量分布在楼体上的装置
XU CHANGHUA (author) / HAN PEIJIN (author) / MENG XIAONAN (author) / LIU QIMING (author) / HAN QING (author) / WANG CHUHAN (author) / CHEN JING (author) / HU SEN (author) / HAN WENQIANG (author)
2022-01-14
Patent
Electronic Resource
Chinese
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
F23J
REMOVAL OR TREATMENT OF COMBUSTION PRODUCTS OR COMBUSTION RESIDUES
,
Beseitigung oder Behandlung von Verbrennungsprodukten oder Verbrennungsrückständen
Flue gas duct system for distributing flue gas duct weight on building body
European Patent Office | 2022
|