Construction method of detachable fence
The invention particularly relates to a construction method of a detachable fence. The construction method is characterized by comprising the following steps that step 1, the fence is positioned; 2, a steel bar rod pull wire is hung, wire hanging is carried out at the points with the determined elevation and position, site leveling is carried out within 50 cm of the periphery of a wire after wire hanging is completed, the elevation of the bottom of the fence is guaranteed, and the safety of a temporary building is rapidly guaranteed; 3, concrete pouring is carried out, specifically, concrete is poured after the line is translated to the designed elevation on the steel bar rod, the elevation is strictly controlled according to the line, and in the process, infrared rays and guiding rule tools are used to guarantee the flatness of the ground; 4, wire hanging and handrail installing are carried out; and 5, the reliability of the fence is confirmed, and whether nuts of connecting pieces are tightened and put into use or not is checked. Compared with the prior art, the fence and the construction method thereof can effectively solve the problem that the construction period is long due to reverse ridges, meanwhile, the length can be adjusted according to the site length, and further, the fence has the advantages of being convenient to disassemble and fast to move, and saving the construction period and labor.
本发明具体是一种可拆卸式围挡的施工方法;其特征是:包括步骤1、围挡定位;步骤2、挂钢筋棍拉线,在已确定标高及位置的点进行挂线,挂完线后在线周边50cm内进行场地平整,保证围挡底部标高,快速保证临时建筑的安全性;步骤3、混凝土浇筑,将线在钢筋棍上平移到设计标高后浇筑混凝土,根据线而定,严格控制标高,过程中,使用红外线,靠尺工具,保证地面的平整度;步骤4、挂线安装栏杆;步骤5确认围挡的可靠性,检查个连接件的螺母是否拧紧并投入使用。本发明所提出的围挡及其施工方法与现有技术相比,能够有效解决因反坎施工周期长问题,同时可根据现场长度进行长度调节,进一步,本围挡具有方便拆卸,移动快捷,节省工期及人工。
Construction method of detachable fence
The invention particularly relates to a construction method of a detachable fence. The construction method is characterized by comprising the following steps that step 1, the fence is positioned; 2, a steel bar rod pull wire is hung, wire hanging is carried out at the points with the determined elevation and position, site leveling is carried out within 50 cm of the periphery of a wire after wire hanging is completed, the elevation of the bottom of the fence is guaranteed, and the safety of a temporary building is rapidly guaranteed; 3, concrete pouring is carried out, specifically, concrete is poured after the line is translated to the designed elevation on the steel bar rod, the elevation is strictly controlled according to the line, and in the process, infrared rays and guiding rule tools are used to guarantee the flatness of the ground; 4, wire hanging and handrail installing are carried out; and 5, the reliability of the fence is confirmed, and whether nuts of connecting pieces are tightened and put into use or not is checked. Compared with the prior art, the fence and the construction method thereof can effectively solve the problem that the construction period is long due to reverse ridges, meanwhile, the length can be adjusted according to the site length, and further, the fence has the advantages of being convenient to disassemble and fast to move, and saving the construction period and labor.
本发明具体是一种可拆卸式围挡的施工方法;其特征是:包括步骤1、围挡定位;步骤2、挂钢筋棍拉线,在已确定标高及位置的点进行挂线,挂完线后在线周边50cm内进行场地平整,保证围挡底部标高,快速保证临时建筑的安全性;步骤3、混凝土浇筑,将线在钢筋棍上平移到设计标高后浇筑混凝土,根据线而定,严格控制标高,过程中,使用红外线,靠尺工具,保证地面的平整度;步骤4、挂线安装栏杆;步骤5确认围挡的可靠性,检查个连接件的螺母是否拧紧并投入使用。本发明所提出的围挡及其施工方法与现有技术相比,能够有效解决因反坎施工周期长问题,同时可根据现场长度进行长度调节,进一步,本围挡具有方便拆卸,移动快捷,节省工期及人工。
Construction method of detachable fence
一种可拆卸式围挡的施工方法
HE RAN (author) / ZHANG YUEQI (author) / LI JIAMING (author) / WU SHANGYONG (author) / WANG DING (author) / CHEN XIAN (author)
2022-01-21
Patent
Electronic Resource
Chinese
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Detachable fence mounting equipment for construction site
European Patent Office | 2020
|