A platform for research: civil engineering, architecture and urbanism
Comprehensive isolation belt for road construction
The invention relates to a comprehensive isolation belt for road construction, the comprehensive isolation belt is used for partially isolating a road needing to be repaired to at least form a construction side and a passing side, the comprehensive isolation belt comprises a bottom plate, a first side plate and a second side plate, the first side plate and the second side plate are arranged on the bottom plate, the first side plate is located on the side, away from the construction side, of the bottom plate, the second side plate is located on the side, close to the construction side, of the bottom plate, and the second side plate at least has a first state that the second side plate is parallel to the first side plate to form an isolation channel roughly in the road extending direction, and a second state in which the second side plate is approximately parallel to the road surface and is lapped on the road shoulder of the construction side so as to form temporary protection on the constructed road surface. According to the comprehensive isolation belt for road construction, after construction is completed, the second side plate can be put down and lapped to a road shoulder, accidental treading of small animals can be completely guaranteed, and reworking is avoided.
本公开涉及一种道路施工用综合隔离带,用于对需要进行修补的道路进行部分隔离以至少形成施工侧和通行侧,其包括底板和设置于所述底板上的第一侧板和第二侧板,其中,所述第一侧板位于所述底板远离所述施工侧的一侧,所述第二侧板位于所述底板靠近所述施工侧的一侧,且所述第二侧板至少具有与所述第一侧板平行以构成一大致沿道路延伸方向的隔离通道的第一状态,以及大致与路面平行且搭接在所述施工侧的路肩上以对施工后路面形成临时防护的第二状态。本发明提供的道路施工用综合隔离带,在施工完成后,可将第二侧板放下并搭接到路肩,可完全确保小动物的意外踩踏,避免返工。
Comprehensive isolation belt for road construction
The invention relates to a comprehensive isolation belt for road construction, the comprehensive isolation belt is used for partially isolating a road needing to be repaired to at least form a construction side and a passing side, the comprehensive isolation belt comprises a bottom plate, a first side plate and a second side plate, the first side plate and the second side plate are arranged on the bottom plate, the first side plate is located on the side, away from the construction side, of the bottom plate, the second side plate is located on the side, close to the construction side, of the bottom plate, and the second side plate at least has a first state that the second side plate is parallel to the first side plate to form an isolation channel roughly in the road extending direction, and a second state in which the second side plate is approximately parallel to the road surface and is lapped on the road shoulder of the construction side so as to form temporary protection on the constructed road surface. According to the comprehensive isolation belt for road construction, after construction is completed, the second side plate can be put down and lapped to a road shoulder, accidental treading of small animals can be completely guaranteed, and reworking is avoided.
本公开涉及一种道路施工用综合隔离带,用于对需要进行修补的道路进行部分隔离以至少形成施工侧和通行侧,其包括底板和设置于所述底板上的第一侧板和第二侧板,其中,所述第一侧板位于所述底板远离所述施工侧的一侧,所述第二侧板位于所述底板靠近所述施工侧的一侧,且所述第二侧板至少具有与所述第一侧板平行以构成一大致沿道路延伸方向的隔离通道的第一状态,以及大致与路面平行且搭接在所述施工侧的路肩上以对施工后路面形成临时防护的第二状态。本发明提供的道路施工用综合隔离带,在施工完成后,可将第二侧板放下并搭接到路肩,可完全确保小动物的意外踩踏,避免返工。
Comprehensive isolation belt for road construction
道路施工用综合隔离带
WEI WENBIN (author) / MA JIANJUN (author) / ZHANG XINGQUAN (author) / WANG JIANZHOU (author) / KE SHENGLONG (author)
2022-01-25
Patent
Electronic Resource
Chinese
Road construction isolation belt and construction method
European Patent Office | 2023
|Environment-friendly isolation belt for road construction
European Patent Office | 2021
|