A platform for research: civil engineering, architecture and urbanism
Integral slab culvert capable of being quickly constructed and construction method thereof
The invention discloses an integral slab culvert capable of being quickly constructed. The integral slab culvert comprises a prefabricated bottom plate, a prefabricated culvert body and a prefabricated cover plate, an anchor bolt is pre-buried in the bottom plate, a base framework steel plate, base side steel plates, stiffening steel plates and rectangular twisted steel are arranged at the bottom of the culvert body, the base framework steel plate is connected with the anchor bolt through a double-layer nut, the culvert body is provided with an embedded bolt used for installing a lifting appliance, the cover plate is arranged on a platform cap at the upper end of the culvert body, a sticky steel glue layer is arranged below the base framework steel plate, a stainless steel box cover is arranged on the side, facing water, of the bottom of the culvert body, and the water-facing side of the base framework steel plate and a steel plate on the base side are accommodated in the stainless steel box cover. The problems that an existing integral slab culvert is low in construction efficiency, a cast-in-place slab culvert is high in manufacturing cost, and the construction and maintenance quality is uneven are solved.
本发明公开了一种能够快速施工的整体式盖板涵,包括预制底板、预制涵身和预制盖板,所述底板内预埋有锚固螺栓,所述涵身底部设置有底座骨架钢板、底座侧钢板、加劲钢板和矩形螺纹钢筋,所述底座骨架钢板与锚固螺栓通过双层螺帽连接,所述涵身上设置有用于安装吊具的预埋螺栓,所述盖板设置于涵身上端的台帽上,所述底座骨架钢板下方设置有粘钢胶层,所述涵身底部的临水一侧设置有不锈钢箱盖,所述临水一侧底座骨架钢板和底座侧钢板容置于不锈钢箱盖内。解决了现有整体式盖板涵施工效率低、现浇盖板涵造价高、施工养护质量参差不齐等问题。
Integral slab culvert capable of being quickly constructed and construction method thereof
The invention discloses an integral slab culvert capable of being quickly constructed. The integral slab culvert comprises a prefabricated bottom plate, a prefabricated culvert body and a prefabricated cover plate, an anchor bolt is pre-buried in the bottom plate, a base framework steel plate, base side steel plates, stiffening steel plates and rectangular twisted steel are arranged at the bottom of the culvert body, the base framework steel plate is connected with the anchor bolt through a double-layer nut, the culvert body is provided with an embedded bolt used for installing a lifting appliance, the cover plate is arranged on a platform cap at the upper end of the culvert body, a sticky steel glue layer is arranged below the base framework steel plate, a stainless steel box cover is arranged on the side, facing water, of the bottom of the culvert body, and the water-facing side of the base framework steel plate and a steel plate on the base side are accommodated in the stainless steel box cover. The problems that an existing integral slab culvert is low in construction efficiency, a cast-in-place slab culvert is high in manufacturing cost, and the construction and maintenance quality is uneven are solved.
本发明公开了一种能够快速施工的整体式盖板涵,包括预制底板、预制涵身和预制盖板,所述底板内预埋有锚固螺栓,所述涵身底部设置有底座骨架钢板、底座侧钢板、加劲钢板和矩形螺纹钢筋,所述底座骨架钢板与锚固螺栓通过双层螺帽连接,所述涵身上设置有用于安装吊具的预埋螺栓,所述盖板设置于涵身上端的台帽上,所述底座骨架钢板下方设置有粘钢胶层,所述涵身底部的临水一侧设置有不锈钢箱盖,所述临水一侧底座骨架钢板和底座侧钢板容置于不锈钢箱盖内。解决了现有整体式盖板涵施工效率低、现浇盖板涵造价高、施工养护质量参差不齐等问题。
Integral slab culvert capable of being quickly constructed and construction method thereof
一种能够快速施工的整体式盖板涵及其施工方法
LIU KAI (author) / NING GUIXIA (author) / LI MINFENG (author) / ZHANG LEI (author) / LI QIANG (author)
2022-01-28
Patent
Electronic Resource
Chinese
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Cover slab culvert construction moving frame and construction method thereof
European Patent Office | 2024
|Fabricated slab culvert mounting equipment and construction method thereof
European Patent Office | 2024
|Mongolian yurt capable of being quickly constructed and manual constructing method thereof
European Patent Office | 2015
|Combined type honeycomb building capable of being quickly constructed
European Patent Office | 2020
|