A platform for research: civil engineering, architecture and urbanism
Magnetic formwork construction platform for dam construction
The invention discloses a magnetic formwork construction platform for dam construction, relates to the technical field of dam construction, and solves the problem of slurry leakage; the platform comprises rails erected at equal intervals in the inclination direction of a slope surface of a dam, sliding formwork tables mounted on the adjacent rails and a winch fixedly mounted at the top of the dam and used for pulling the sliding formwork tables. Each sliding formwork table comprises a rectangular frame, the rectangular frame is provided with a first frame strip, two side frame strips and a second frame strip, the two side frame strips are perpendicularly connected to the two ends of the first frame strip respectively, the second frame strip is parallel to the first frame strip, and the ends, away from the first frame strip, of the two side frame strips are vertically connected with the two ends of the second frame strip respectively. The problem of slurry leakage in the slope surface construction process can be solved, and meanwhile the uniformity of the pouring thickness of the slope surface of the dam is improved.
本申请公开了一种大坝施工用磁力模板施工平台,涉及大坝施工技术领域,改善了漏浆的问题,其包括沿大坝的斜坡面倾斜方向等间距架设的轨道、安装于相邻轨道上的滑模台以及固定安装于大坝顶部用于牵引滑模台的卷扬机,所述滑模台包括:矩形框,矩形框具有第一框条、两个分别垂直连接于第一框条两端的侧框条以及与第一框条平行的第二框条,两个所述侧框条远离第一框条的一端分别与第二框条的两端垂直连接。本申请能够阻止坡面施工过程中的漏浆问题的发生,同时提高大坝斜坡面浇筑厚度的均匀性。
Magnetic formwork construction platform for dam construction
The invention discloses a magnetic formwork construction platform for dam construction, relates to the technical field of dam construction, and solves the problem of slurry leakage; the platform comprises rails erected at equal intervals in the inclination direction of a slope surface of a dam, sliding formwork tables mounted on the adjacent rails and a winch fixedly mounted at the top of the dam and used for pulling the sliding formwork tables. Each sliding formwork table comprises a rectangular frame, the rectangular frame is provided with a first frame strip, two side frame strips and a second frame strip, the two side frame strips are perpendicularly connected to the two ends of the first frame strip respectively, the second frame strip is parallel to the first frame strip, and the ends, away from the first frame strip, of the two side frame strips are vertically connected with the two ends of the second frame strip respectively. The problem of slurry leakage in the slope surface construction process can be solved, and meanwhile the uniformity of the pouring thickness of the slope surface of the dam is improved.
本申请公开了一种大坝施工用磁力模板施工平台,涉及大坝施工技术领域,改善了漏浆的问题,其包括沿大坝的斜坡面倾斜方向等间距架设的轨道、安装于相邻轨道上的滑模台以及固定安装于大坝顶部用于牵引滑模台的卷扬机,所述滑模台包括:矩形框,矩形框具有第一框条、两个分别垂直连接于第一框条两端的侧框条以及与第一框条平行的第二框条,两个所述侧框条远离第一框条的一端分别与第二框条的两端垂直连接。本申请能够阻止坡面施工过程中的漏浆问题的发生,同时提高大坝斜坡面浇筑厚度的均匀性。
Magnetic formwork construction platform for dam construction
一种大坝施工用磁力模板施工平台
XUE XISONG (author) / WANG CHENGLIN (author) / LI WEIJIE (author)
2022-01-28
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
European Patent Office | 2024
|Formwork support of outrigger construction formwork, construction formwork and construction method
European Patent Office | 2024
|