A platform for research: civil engineering, architecture and urbanism
Formwork structure and formwork system
The invention discloses a formwork structure and a formwork system, and relates to the technical field of concrete construction. The formwork structure comprises a formwork main frame, a first formwork and a second formwork, the formwork main frame comprises a cross beam and two stand columns which are connected with each other, and the stand columns and the cross beam jointly form a door type structure. The stand column comprises a first standard stand column and a first adjusting stand column which are detachably connected in sequence, and the first standard stand column is connected with the cross beam. The first formwork is arranged on the side face of the stand column, and the second formwork is arranged on the top of the beam. And the first formwork and the second formwork are jointly used for molding newly-poured concrete. The formwork system is of a formwork structure, and the formwork structure and the formwork system have the advantage of being high in universality.
本发明公开了一种模板结构及模板系统,涉及混凝土施工技术领域。该模板结构包括模板主架、第一模板及第二模板。模板主架包括相互连接的横梁和两根立柱,立柱和横梁共同形成门式结构。立柱包括依次可拆卸连接的第一标准立柱和第一调节立柱,第一标准立柱与横梁连接。第一模板设置于立柱的侧面,第二模板设置于横梁的顶部。且第一模板与第二模板共同用于新浇混凝土成型。模板系统采用模板结构,该模板结构及模板系统均具有通用性较高的特点。
Formwork structure and formwork system
The invention discloses a formwork structure and a formwork system, and relates to the technical field of concrete construction. The formwork structure comprises a formwork main frame, a first formwork and a second formwork, the formwork main frame comprises a cross beam and two stand columns which are connected with each other, and the stand columns and the cross beam jointly form a door type structure. The stand column comprises a first standard stand column and a first adjusting stand column which are detachably connected in sequence, and the first standard stand column is connected with the cross beam. The first formwork is arranged on the side face of the stand column, and the second formwork is arranged on the top of the beam. And the first formwork and the second formwork are jointly used for molding newly-poured concrete. The formwork system is of a formwork structure, and the formwork structure and the formwork system have the advantage of being high in universality.
本发明公开了一种模板结构及模板系统,涉及混凝土施工技术领域。该模板结构包括模板主架、第一模板及第二模板。模板主架包括相互连接的横梁和两根立柱,立柱和横梁共同形成门式结构。立柱包括依次可拆卸连接的第一标准立柱和第一调节立柱,第一标准立柱与横梁连接。第一模板设置于立柱的侧面,第二模板设置于横梁的顶部。且第一模板与第二模板共同用于新浇混凝土成型。模板系统采用模板结构,该模板结构及模板系统均具有通用性较高的特点。
Formwork structure and formwork system
模板结构及模板系统
LI XIAOPENG (author) / LYU KAI (author) / HU FEN (author) / LI XIAODONG (author) / NIE QINGNIAN (author) / LIU QIANQIAN (author) / XU WENBING (author) / ZHONG ZHENGYONG (author) / JIE WENBO (author) / LI YAN (author)
2022-01-28
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste