Ground power plant debris flow post-disaster restoration method
The invention discloses a ground power plant debris flow post-disaster restoration method, belongs to the field of water conservancy and hydropower engineering, and provides a ground power plant debris flow post-disaster restoration method capable of restoring production of a ground power plant as soon as possible and improving debris flow disaster resistance of the ground power plant. According to the method, the enclosure retaining wall is built in time after dredging, and the tail water channel is reconstructed, so that the problems that the repairing time is long after the ground power plant suffers from debris flow disasters and potential safety hazards still exist after repairing are solved, and repairing and production recovery can be realized as early as possible after the ground power plant suffers from debris flow disasters, and the debris flow resistance can be improved after repairing, long-term safe and stable operation of the hydropower station plant can be ensured, and the characteristic that the ground power plant is prevented from being damaged again after one-time treatment is achieved.
本发明公开了一种地面发电厂房泥石流灾后修复方法,属于水利水电工程领域,提供一种能够尽快恢复地面发电厂房生产以及可提高地面发电厂房抗泥石流灾害能力的地面发电厂房泥石流灾后修复方法。本发明通过清淤后及时修筑围护挡墙,并改建尾水渠,解决了地面发电厂房遭受泥石流灾害后修复时间长,以及修复后仍然存在安全隐患的问题,可在地面发电厂房遭受泥石流灾害后实现尽早的修复和恢复生产,并且修复后还能提高其抗泥石流的能力,可确保水电站厂房的长期安全稳定运行,做到一次治理后确保地面发电厂房免遭再次侵害的特点。
Ground power plant debris flow post-disaster restoration method
The invention discloses a ground power plant debris flow post-disaster restoration method, belongs to the field of water conservancy and hydropower engineering, and provides a ground power plant debris flow post-disaster restoration method capable of restoring production of a ground power plant as soon as possible and improving debris flow disaster resistance of the ground power plant. According to the method, the enclosure retaining wall is built in time after dredging, and the tail water channel is reconstructed, so that the problems that the repairing time is long after the ground power plant suffers from debris flow disasters and potential safety hazards still exist after repairing are solved, and repairing and production recovery can be realized as early as possible after the ground power plant suffers from debris flow disasters, and the debris flow resistance can be improved after repairing, long-term safe and stable operation of the hydropower station plant can be ensured, and the characteristic that the ground power plant is prevented from being damaged again after one-time treatment is achieved.
本发明公开了一种地面发电厂房泥石流灾后修复方法,属于水利水电工程领域,提供一种能够尽快恢复地面发电厂房生产以及可提高地面发电厂房抗泥石流灾害能力的地面发电厂房泥石流灾后修复方法。本发明通过清淤后及时修筑围护挡墙,并改建尾水渠,解决了地面发电厂房遭受泥石流灾害后修复时间长,以及修复后仍然存在安全隐患的问题,可在地面发电厂房遭受泥石流灾害后实现尽早的修复和恢复生产,并且修复后还能提高其抗泥石流的能力,可确保水电站厂房的长期安全稳定运行,做到一次治理后确保地面发电厂房免遭再次侵害的特点。
Ground power plant debris flow post-disaster restoration method
地面发电厂房泥石流灾后修复方法
JIANG BO (author) / QIU LING (author) / TAN KEQI (author) / LI LINGXIA (author) / WEI YINGYU (author)
2022-01-28
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
/
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
/
E03F
SEWERS
,
Abwasserkanäle
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
British Library Conference Proceedings | 1984
|Modeling Post-Disaster Urban Lifeline Restoration
British Library Conference Proceedings | 1999
|A Study on Disaster and Restoration of Debris Flow Landslides at Inje, Kangwon Province, Korea
British Library Conference Proceedings | 2009
|