A platform for research: civil engineering, architecture and urbanism
Rail trolley set
The invention provides a rail trolley set which comprises a long steel rail transport vehicle and a rail collecting and replacing device, the rail collecting and replacing device is located on the long steel rail transport vehicle and can move on the long steel rail transport vehicle, the rail collecting and replacing device comprises a first trolley, a telescopic assembly and a rail adjusting structure, and the first trolley is connected with the telescopic assembly; the telescopic assembly can drive the first trolley to move to the track, the first trolley is used for moving old steel rails to one side of the track line, and new steel rails on the long steel rail transport vehicle are moved to the track line through the rail adjusting structure. According to the rail trolley set, two operation processes of transporting new steel rails and changing the rails can be completed in one skylight period, the whole operation process only occupies one skylight period, and the operation efficiency is improved.
本发明提供一种轨道车组,轨道车组包括长钢轨运输车和收换轨装置,收换轨装置位于长钢轨运输车上,且可在长钢轨运输车上移动,收换轨装置包括第一小车、伸缩组件和调轨结构,第一小车与伸缩组件连接,伸缩组件可驱动第一小车移动至轨道上,第一小车用于将旧钢轨移动至轨道线路的一侧,且长钢轨运输车上的新钢轨通过调轨结构移动至轨道线路上。本发明提供的轨道车组可在一个天窗期内完成运输新钢轨和换轨两个作业过程,实现整个作业过程只占用一个天窗期,提高了作业效率。
Rail trolley set
The invention provides a rail trolley set which comprises a long steel rail transport vehicle and a rail collecting and replacing device, the rail collecting and replacing device is located on the long steel rail transport vehicle and can move on the long steel rail transport vehicle, the rail collecting and replacing device comprises a first trolley, a telescopic assembly and a rail adjusting structure, and the first trolley is connected with the telescopic assembly; the telescopic assembly can drive the first trolley to move to the track, the first trolley is used for moving old steel rails to one side of the track line, and new steel rails on the long steel rail transport vehicle are moved to the track line through the rail adjusting structure. According to the rail trolley set, two operation processes of transporting new steel rails and changing the rails can be completed in one skylight period, the whole operation process only occupies one skylight period, and the operation efficiency is improved.
本发明提供一种轨道车组,轨道车组包括长钢轨运输车和收换轨装置,收换轨装置位于长钢轨运输车上,且可在长钢轨运输车上移动,收换轨装置包括第一小车、伸缩组件和调轨结构,第一小车与伸缩组件连接,伸缩组件可驱动第一小车移动至轨道上,第一小车用于将旧钢轨移动至轨道线路的一侧,且长钢轨运输车上的新钢轨通过调轨结构移动至轨道线路上。本发明提供的轨道车组可在一个天窗期内完成运输新钢轨和换轨两个作业过程,实现整个作业过程只占用一个天窗期,提高了作业效率。
Rail trolley set
轨道车组
WANG SICONG (author) / GAO JUN (author) / CUI YONGJUN (author) / TIAN WEI (author)
2022-02-08
Patent
Electronic Resource
Chinese
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Rail welding trolley multiple rail welding replacing construction method
European Patent Office | 2015
|