A platform for research: civil engineering, architecture and urbanism
Ecological pile plate type retaining wall and construction method thereof
The invention provides an ecological pile plate type retaining wall and a construction method thereof. The ecological pile plate type retaining wall comprises a plurality of pile bodies, cap beams fixed to the tops of the pile bodies, first grooves formed in the cap beams, hanging plates fixedly arranged on the front sides of the pile bodies and groove bodies installed on the hanging plates, wherein top ends of the hanging plates are fixedly connected with the cap beams; a second groove is formed between the hanging plate and the groove body, and vegetation is planted in the first groove and the second groove. According to the ecological pile plate type retaining wall, the hanging plate is arranged on the front side of the pile body, after the pile body is poured, a slope on the rear side of the pile body does not need to be excavated, the procedure of backfilling soil after the hanging plate is poured is also avoided, and the construction period is short; the cap beam is provided with the first groove, the hanging plate is provided with the groove body, the first groove and the groove body are both backfilled with soil, vegetation is planted on the backfilled soil, attractiveness of the retaining wall can be improved, and the retaining wall can be integrated with the surrounding environment.
本发明提供一种生态桩板式挡墙及其施工方法,所述生态桩板式挡墙包括若干根桩体、固定在桩体顶部的帽梁、开设在帽梁上的第一沟槽、固定设置在桩体前方侧的挂板、以及安装在挂板上的沟槽体,所述挂板顶端与帽梁固定连接,所述挂板和沟槽体之间形成有第二沟槽,所述第一沟槽与第二沟槽中均种植有植被。本发明中涉及的生态桩板式挡墙,挂板设置在桩体的前方侧,在桩体浇筑完成后,无需对桩体后侧的边坡进行开挖,也避免了对浇筑挂板后进行回填土的程序,施工周期短;帽梁上设置有第一沟槽,挂板上设置有沟槽体,并且第一沟槽和沟槽体中均回填土,在回填土上种植植被,能够提高挡墙的美观与周边环境融为一体。
Ecological pile plate type retaining wall and construction method thereof
The invention provides an ecological pile plate type retaining wall and a construction method thereof. The ecological pile plate type retaining wall comprises a plurality of pile bodies, cap beams fixed to the tops of the pile bodies, first grooves formed in the cap beams, hanging plates fixedly arranged on the front sides of the pile bodies and groove bodies installed on the hanging plates, wherein top ends of the hanging plates are fixedly connected with the cap beams; a second groove is formed between the hanging plate and the groove body, and vegetation is planted in the first groove and the second groove. According to the ecological pile plate type retaining wall, the hanging plate is arranged on the front side of the pile body, after the pile body is poured, a slope on the rear side of the pile body does not need to be excavated, the procedure of backfilling soil after the hanging plate is poured is also avoided, and the construction period is short; the cap beam is provided with the first groove, the hanging plate is provided with the groove body, the first groove and the groove body are both backfilled with soil, vegetation is planted on the backfilled soil, attractiveness of the retaining wall can be improved, and the retaining wall can be integrated with the surrounding environment.
本发明提供一种生态桩板式挡墙及其施工方法,所述生态桩板式挡墙包括若干根桩体、固定在桩体顶部的帽梁、开设在帽梁上的第一沟槽、固定设置在桩体前方侧的挂板、以及安装在挂板上的沟槽体,所述挂板顶端与帽梁固定连接,所述挂板和沟槽体之间形成有第二沟槽,所述第一沟槽与第二沟槽中均种植有植被。本发明中涉及的生态桩板式挡墙,挂板设置在桩体的前方侧,在桩体浇筑完成后,无需对桩体后侧的边坡进行开挖,也避免了对浇筑挂板后进行回填土的程序,施工周期短;帽梁上设置有第一沟槽,挂板上设置有沟槽体,并且第一沟槽和沟槽体中均回填土,在回填土上种植植被,能够提高挡墙的美观与周边环境融为一体。
Ecological pile plate type retaining wall and construction method thereof
一种生态桩板式挡墙及其施工方法
HAN SHAOXUAN (author) / WAN LIPIAO (author) / ZHOU PEIYONG (author) / ZHU XINXING (author) / HUA PENGFEI (author)
2022-02-11
Patent
Electronic Resource
Chinese
Pile plate reinforced retaining wall and construction method thereof
European Patent Office | 2020
|Pile plate type retaining wall combined frame and construction method
European Patent Office | 2022
|Construction method of pile plate type retaining wall composite structure
European Patent Office | 2022
|European Patent Office | 2023
|