A platform for research: civil engineering, architecture and urbanism
Quickly-assembled anti-deformation steel structure curtain wall and construction method thereof
The invention discloses a quickly-assembled anti-deformation steel structure curtain wall and a construction method thereof, and belongs to the technical field of curtain walls. The quickly-assembled anti-deformation steel structure curtain wall comprises a vertical frame, a first illuminating lamp and a second illuminating lamp are fixedly mounted on the vertical frame, connectors are integrally formed at the two ends of the vertical frame, and connecting seats are slidably arranged on the connectors. Corresponding sleeves are pressed to drive corresponding U-shaped plates to move towards the sides close to push plates, fourth springs are compressed, then through cooperation with use of inclined grooves, corresponding fixing rods can be driven to move in opposite directions through the two sets of push plates, third springs are compressed, telescopic rods are contracted, then, a user can sleeve a fixing groove in one end of a transverse frame on a corresponding fixing plate, at the moment, the user can loosen the sleeves, and a U-shaped plate and a fixing rod can be driven to reset under the elastic force action of the fourth springs and the third springs, so that the fixing rod is inserted into a corresponding fixing hole, the vertical frame and the transverse frame are conveniently assembled, and the mounting efficiency is improved.
本发明公开了一种快装抗变形的钢结构幕墙及其施工方法,属于幕墙技术领域,包括立架,所述立架上固定安装有第一照明灯与第二照明灯,所述立架的两端均一体成型有连接头,所述连接头上滑动设有连接座。按压对应套筒,从而使其带动对应U型板向靠近推板的一侧移动,且压缩第四弹簧,进而配合斜槽的使用,能够通过两组推板带动对应固定杆做相向运动,且压缩第三弹簧并使伸缩杆收缩,之后使用者可将横架一端的固定槽套接在对应固定板上,此时使用者可松开套筒,在第四弹簧与第三弹簧的弹力作用下,能够带动U型板与固定杆复位,从而使固定杆插设在对应固定孔内,进而实现了立架与横架的便捷组装,提高了安装效率。
Quickly-assembled anti-deformation steel structure curtain wall and construction method thereof
The invention discloses a quickly-assembled anti-deformation steel structure curtain wall and a construction method thereof, and belongs to the technical field of curtain walls. The quickly-assembled anti-deformation steel structure curtain wall comprises a vertical frame, a first illuminating lamp and a second illuminating lamp are fixedly mounted on the vertical frame, connectors are integrally formed at the two ends of the vertical frame, and connecting seats are slidably arranged on the connectors. Corresponding sleeves are pressed to drive corresponding U-shaped plates to move towards the sides close to push plates, fourth springs are compressed, then through cooperation with use of inclined grooves, corresponding fixing rods can be driven to move in opposite directions through the two sets of push plates, third springs are compressed, telescopic rods are contracted, then, a user can sleeve a fixing groove in one end of a transverse frame on a corresponding fixing plate, at the moment, the user can loosen the sleeves, and a U-shaped plate and a fixing rod can be driven to reset under the elastic force action of the fourth springs and the third springs, so that the fixing rod is inserted into a corresponding fixing hole, the vertical frame and the transverse frame are conveniently assembled, and the mounting efficiency is improved.
本发明公开了一种快装抗变形的钢结构幕墙及其施工方法,属于幕墙技术领域,包括立架,所述立架上固定安装有第一照明灯与第二照明灯,所述立架的两端均一体成型有连接头,所述连接头上滑动设有连接座。按压对应套筒,从而使其带动对应U型板向靠近推板的一侧移动,且压缩第四弹簧,进而配合斜槽的使用,能够通过两组推板带动对应固定杆做相向运动,且压缩第三弹簧并使伸缩杆收缩,之后使用者可将横架一端的固定槽套接在对应固定板上,此时使用者可松开套筒,在第四弹簧与第三弹簧的弹力作用下,能够带动U型板与固定杆复位,从而使固定杆插设在对应固定孔内,进而实现了立架与横架的便捷组装,提高了安装效率。
Quickly-assembled anti-deformation steel structure curtain wall and construction method thereof
一种快装抗变形的钢结构幕墙及其施工方法
ZHU XINGUO (author) / ZHU MENGHAO (author) / HAN LIANDENG (author)
2022-02-15
Patent
Electronic Resource
Chinese
Quickly-assembled building glass curtain wall structure and construction method thereof
European Patent Office | 2025
|Quickly-formed curtain wall structure and construction method thereof
European Patent Office | 2021
|Photovoltaic curtain wall capable of being quickly assembled
European Patent Office | 2023
|