A platform for research: civil engineering, architecture and urbanism
Rapid pipeline desilting and dredging device for municipal water conservancy project
The invention discloses a rapid pipeline desilting and dredging device for municipal water conservancy projects, and relates to the technical field of pipeline desilting. The problems of the dredging effect and the water consumption are solved. The water tank and the water pump are fixedly installed on the outer wall of the top of the base, the dredging assembly is connected to the water pump through a hose, the dredging assembly comprises a fixing sleeve and a dredging head, the fixing sleeve is connected to the end of the hose through a hoop, and the dredging head is rotationally connected to the outer wall of the fixing sleeve; and a drill bit is fixedly installed on the outer wall of the other side of the dredging head, the inner wall of the fixing sleeve is rotationally connected with a connecting shaft through a built-in plate, and a turbine is fixedly installed at one end of the connecting shaft. According to the dredging device, the drill bit is arranged, the drill bit is used for drilling sludge, then the scraper is used for expanding towards the periphery, and then the drain hole is used for discharging water for flushing, so that the dredging mode of breaking the surface in a point mode and dredging from inside to outside is achieved, and therefore the dredging efficiency and effect are improved, and meanwhile the water consumption for dredging is reduced.
本发明公开了一种市政水利工程用管道快速清淤疏通装置,涉及管道清淤技术领域;为了解决清淤效果以及用水量问题;具体包括底座、固定安装于底座顶部外壁的水箱与水泵、通过软管连接于水泵的疏通组件,所述疏通组件包括固定套和疏通头,所述固定套通过抱箍连接于软管的端部,所述疏通头转动连接于固定套的外壁,所述疏通头的另一侧外壁固定安装有钻头,所述固定套的内壁通过内置板转动连接有连轴,连轴的一端固定安装有涡轮。本发明通过设置钻头,其首选对淤泥进行钻孔,再利用刮刀向四周扩大,再利用排水孔出水进行冲刷,实现了以点破面,由内而外的清淤方式,从而在提高了清淤效率、效果的同时,也降低了清淤的用水量。
Rapid pipeline desilting and dredging device for municipal water conservancy project
The invention discloses a rapid pipeline desilting and dredging device for municipal water conservancy projects, and relates to the technical field of pipeline desilting. The problems of the dredging effect and the water consumption are solved. The water tank and the water pump are fixedly installed on the outer wall of the top of the base, the dredging assembly is connected to the water pump through a hose, the dredging assembly comprises a fixing sleeve and a dredging head, the fixing sleeve is connected to the end of the hose through a hoop, and the dredging head is rotationally connected to the outer wall of the fixing sleeve; and a drill bit is fixedly installed on the outer wall of the other side of the dredging head, the inner wall of the fixing sleeve is rotationally connected with a connecting shaft through a built-in plate, and a turbine is fixedly installed at one end of the connecting shaft. According to the dredging device, the drill bit is arranged, the drill bit is used for drilling sludge, then the scraper is used for expanding towards the periphery, and then the drain hole is used for discharging water for flushing, so that the dredging mode of breaking the surface in a point mode and dredging from inside to outside is achieved, and therefore the dredging efficiency and effect are improved, and meanwhile the water consumption for dredging is reduced.
本发明公开了一种市政水利工程用管道快速清淤疏通装置,涉及管道清淤技术领域;为了解决清淤效果以及用水量问题;具体包括底座、固定安装于底座顶部外壁的水箱与水泵、通过软管连接于水泵的疏通组件,所述疏通组件包括固定套和疏通头,所述固定套通过抱箍连接于软管的端部,所述疏通头转动连接于固定套的外壁,所述疏通头的另一侧外壁固定安装有钻头,所述固定套的内壁通过内置板转动连接有连轴,连轴的一端固定安装有涡轮。本发明通过设置钻头,其首选对淤泥进行钻孔,再利用刮刀向四周扩大,再利用排水孔出水进行冲刷,实现了以点破面,由内而外的清淤方式,从而在提高了清淤效率、效果的同时,也降低了清淤的用水量。
Rapid pipeline desilting and dredging device for municipal water conservancy project
一种市政水利工程用管道快速清淤疏通装置
ZHAO HANG (author) / GONG GUOFEI (author)
2022-03-01
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Desilting and dredging process for water conservancy project
European Patent Office | 2024
|Desilting and dredging process for water conservancy project
European Patent Office | 2022
|