A platform for research: civil engineering, architecture and urbanism
Construction method for special-shaped structure of fair-faced concrete sheet wall
The invention particularly relates to a construction method of a bearing special-shaped structure. The construction method comprises the steps that 1, formwork type selection is conducted; step 2, template processing; step 3, mounting internal components of the formwork; step 4, mounting and reinforcing the formwork; step 5, positioning and supporting the bottom of the arc-shaped beam; step 6, positioning, measuring and checking; 7, steel bar binding construction is conducted; 8, pouring construction of clear water concrete is conducted; step 9, curing the fair-faced concrete; 10, the fair-faced concrete is subjected to form removal; step 11, curing the fair-faced concrete; and 12, finished product protection of the bare concrete. According to the method, stability and safety of a supporting system are achieved in the construction process, lines are fixed in place, the surface forming effect is good, and the apparent quality of the bare concrete special-shaped piece wall structure is guaranteed; segmented construction is adopted in the construction process of the piece wall, flow construction operation is formed, and good control is achieved in the construction period.
本发明具体是一种承重异形结构的施工方法,包括步骤1:模板选型;步骤2:模板加工;步骤3:模板内构件安装:步骤4:模板的安装加固;步骤5:弧形梁底的定位及支撑步骤6:定位测量校核;步骤7:钢筋绑扎施工;步骤8:清水混泥土的浇筑施工;步骤9、清水混凝土的养护;步骤10、清水混凝土拆模;步骤11、清水混凝土的养护;步骤12:清水混凝土的成品保护。本方法在施工过程中实现了支撑系统的稳固性和安全性,线条固定到位,表面成型效果好,保证了清水混凝土异形片墙结构的表观质量;片墙在施工中采取分段施工,形成流水施工作业,在工期施工中得到良好的控制。
Construction method for special-shaped structure of fair-faced concrete sheet wall
The invention particularly relates to a construction method of a bearing special-shaped structure. The construction method comprises the steps that 1, formwork type selection is conducted; step 2, template processing; step 3, mounting internal components of the formwork; step 4, mounting and reinforcing the formwork; step 5, positioning and supporting the bottom of the arc-shaped beam; step 6, positioning, measuring and checking; 7, steel bar binding construction is conducted; 8, pouring construction of clear water concrete is conducted; step 9, curing the fair-faced concrete; 10, the fair-faced concrete is subjected to form removal; step 11, curing the fair-faced concrete; and 12, finished product protection of the bare concrete. According to the method, stability and safety of a supporting system are achieved in the construction process, lines are fixed in place, the surface forming effect is good, and the apparent quality of the bare concrete special-shaped piece wall structure is guaranteed; segmented construction is adopted in the construction process of the piece wall, flow construction operation is formed, and good control is achieved in the construction period.
本发明具体是一种承重异形结构的施工方法,包括步骤1:模板选型;步骤2:模板加工;步骤3:模板内构件安装:步骤4:模板的安装加固;步骤5:弧形梁底的定位及支撑步骤6:定位测量校核;步骤7:钢筋绑扎施工;步骤8:清水混泥土的浇筑施工;步骤9、清水混凝土的养护;步骤10、清水混凝土拆模;步骤11、清水混凝土的养护;步骤12:清水混凝土的成品保护。本方法在施工过程中实现了支撑系统的稳固性和安全性,线条固定到位,表面成型效果好,保证了清水混凝土异形片墙结构的表观质量;片墙在施工中采取分段施工,形成流水施工作业,在工期施工中得到良好的控制。
Construction method for special-shaped structure of fair-faced concrete sheet wall
清水混凝土片墙异形结构施工方法
YE HUA (author) / DONG QING (author) / YANG YISONG (author) / CHEN RUI (author) / CHEN LIN (author) / ZHUANG KAICHANG (author) / ZHU XIUZHI (author)
2022-03-01
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Construction method of special-shaped fair-faced concrete roof
European Patent Office | 2023
|Construction method of special-shaped double-sided wood grain fair-faced concrete wall
European Patent Office | 2022
|Special-shaped double-curved-surface fair-faced concrete construction method
European Patent Office | 2023
|Special-shaped structure fair-faced concrete building formwork and construction method thereof
European Patent Office | 2024
|