A platform for research: civil engineering, architecture and urbanism
Scaffold steel pipe bracket
The scaffold steel pipe bracket comprises a first bracket assembly, a second bracket assembly and a steel pipe, and the first bracket assembly comprises a first fixing plate, a first supporting plate, a threaded rod and a first sleeve; the second bracket assembly comprises a second fixing plate, a second supporting plate and a second sleeve, one end of the steel pipe is inserted into the first sleeve, and the other end of the steel pipe is inserted into the second sleeve; a steel pipe is assembled between the first bracket assembly and the second bracket assembly through the first sleeve and the second sleeve, when the steel pipe is damaged, the threaded rod is rotated anticlockwise, then the first sleeve is driven by the threaded rod to be separated from the steel pipe, and after the first sleeve is separated from the steel pipe, the other end of the steel pipe is pulled out of the second sleeve, so that the steel pipe is disassembled, and the steel pipe is conveniently disassembled. And then a new steel pipe is replaced, so that the steel pipe is convenient to assemble, disassemble and replace.
本发明公开了脚手架钢管托架,包括第一托架组件、第二托架组件和钢管,所述第一托架组件包括第一固定板、第一支撑板、螺纹杆和第一套管;所述第二托架组件包括第二固定板、第二支撑板和第二套管,所述钢管一端插接在所述第一套管内,所述钢管另一端插接在所述第二套管内;本发明通过第一套管和第二套管将钢管组装在第一托架组件和第二托架组件之间,当钢管损坏时,逆时针转动螺纹杆,然后通过螺纹杆带动第一套管脱离钢管,待第一套管脱离钢管后,将钢管的另一端从第二套管内拔出,从而将钢管拆卸掉,然后更换新的钢管,这样方便了钢管的组装和拆卸,便于钢管的更换。
Scaffold steel pipe bracket
The scaffold steel pipe bracket comprises a first bracket assembly, a second bracket assembly and a steel pipe, and the first bracket assembly comprises a first fixing plate, a first supporting plate, a threaded rod and a first sleeve; the second bracket assembly comprises a second fixing plate, a second supporting plate and a second sleeve, one end of the steel pipe is inserted into the first sleeve, and the other end of the steel pipe is inserted into the second sleeve; a steel pipe is assembled between the first bracket assembly and the second bracket assembly through the first sleeve and the second sleeve, when the steel pipe is damaged, the threaded rod is rotated anticlockwise, then the first sleeve is driven by the threaded rod to be separated from the steel pipe, and after the first sleeve is separated from the steel pipe, the other end of the steel pipe is pulled out of the second sleeve, so that the steel pipe is disassembled, and the steel pipe is conveniently disassembled. And then a new steel pipe is replaced, so that the steel pipe is convenient to assemble, disassemble and replace.
本发明公开了脚手架钢管托架,包括第一托架组件、第二托架组件和钢管,所述第一托架组件包括第一固定板、第一支撑板、螺纹杆和第一套管;所述第二托架组件包括第二固定板、第二支撑板和第二套管,所述钢管一端插接在所述第一套管内,所述钢管另一端插接在所述第二套管内;本发明通过第一套管和第二套管将钢管组装在第一托架组件和第二托架组件之间,当钢管损坏时,逆时针转动螺纹杆,然后通过螺纹杆带动第一套管脱离钢管,待第一套管脱离钢管后,将钢管的另一端从第二套管内拔出,从而将钢管拆卸掉,然后更换新的钢管,这样方便了钢管的组装和拆卸,便于钢管的更换。
Scaffold steel pipe bracket
脚手架钢管托架
ZHAO WEI (author) / YAN ZHENGPING (author)
2022-03-04
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste