A platform for research: civil engineering, architecture and urbanism
Automatic steel structure stable hoisting equipment
The invention provides automatic stable lifting equipment for a steel structure, and relates to the technical field of lifting appliances. The automatic steel structure stable lifting equipment comprises a rack, a conveying table and a mounting frame, a wind speed sensor is fixedly connected to the top end of the rack, a second worm is fixedly connected to the output end of a second motor, a spline shaft is fixedly connected to the inner side of a second worm gear, and a roller is fixedly connected to the bottom end of a mounting base. Two fan-shaped spray heads are uniformly and fixedly connected to the side, away from the mounting frame, of the inner spray pipe, an outer spray pipe is arranged on the outer side of the inner spray pipe, a flow guide plate is arranged on the inner side of the mounting frame, first flow guide pipes are rotationally connected to the front portion and the rear portion of the flow guide plate, and two second flow guide pipes are fixedly connected to the front portion and the rear portion of the flow guide plate; and the air inlet pipe is communicated with the fan. Air curtains are formed on the upper side and the lower side of the mounting frame, windproof hoisting is achieved, the wind load is reduced, and the hoisting stability is improved.
本发明提供一种自动化的钢结构稳定吊运设备,涉及吊具技术领域。该自动化的钢结构稳定吊运设备,包括机架、运输台和安装架,所述机架顶端固定连接有风速传感器,所述第二电机的输出端固定连接有第二蜗杆,所述第二蜗轮内侧固定连接有花键轴,所述滚筒固定连接在安装座的底端,所述内喷管远离安装架的一侧均匀固定连接有两个扇形喷头,所述内喷管外侧设置有外喷管,所述安装架内侧设置有导流板,所述导流板前部和后部均转动连接有第一导流管,所述导流板前部和后部均固定连接有两个第二导流管,所述进气管与风机连通。通过在安装架上下两侧形成气幕,实现防风吊运,降低风力荷载,提高了吊运的稳定性。
Automatic steel structure stable hoisting equipment
The invention provides automatic stable lifting equipment for a steel structure, and relates to the technical field of lifting appliances. The automatic steel structure stable lifting equipment comprises a rack, a conveying table and a mounting frame, a wind speed sensor is fixedly connected to the top end of the rack, a second worm is fixedly connected to the output end of a second motor, a spline shaft is fixedly connected to the inner side of a second worm gear, and a roller is fixedly connected to the bottom end of a mounting base. Two fan-shaped spray heads are uniformly and fixedly connected to the side, away from the mounting frame, of the inner spray pipe, an outer spray pipe is arranged on the outer side of the inner spray pipe, a flow guide plate is arranged on the inner side of the mounting frame, first flow guide pipes are rotationally connected to the front portion and the rear portion of the flow guide plate, and two second flow guide pipes are fixedly connected to the front portion and the rear portion of the flow guide plate; and the air inlet pipe is communicated with the fan. Air curtains are formed on the upper side and the lower side of the mounting frame, windproof hoisting is achieved, the wind load is reduced, and the hoisting stability is improved.
本发明提供一种自动化的钢结构稳定吊运设备,涉及吊具技术领域。该自动化的钢结构稳定吊运设备,包括机架、运输台和安装架,所述机架顶端固定连接有风速传感器,所述第二电机的输出端固定连接有第二蜗杆,所述第二蜗轮内侧固定连接有花键轴,所述滚筒固定连接在安装座的底端,所述内喷管远离安装架的一侧均匀固定连接有两个扇形喷头,所述内喷管外侧设置有外喷管,所述安装架内侧设置有导流板,所述导流板前部和后部均转动连接有第一导流管,所述导流板前部和后部均固定连接有两个第二导流管,所述进气管与风机连通。通过在安装架上下两侧形成气幕,实现防风吊运,降低风力荷载,提高了吊运的稳定性。
Automatic steel structure stable hoisting equipment
一种自动化的钢结构稳定吊运设备
GAN SILIAN (author)
2022-03-08
Patent
Electronic Resource
Chinese
Steel structure hoisting equipment for green building construction
European Patent Office | 2023
|