A platform for research: civil engineering, architecture and urbanism
Construction method of vertical transportation system
The invention belongs to the technical field of building construction equipment, and particularly relates to a construction method of a vertical transportation system. Equipment installation is completed according to the actual situation of a construction site, and the equipment can be put into use after being debugged to be qualified; in the preparation stage, lifting preparation work is carried out; in the cable hanging stage, the unit bodies are subjected to cable hanging; in the lifting stage, the unit body is lifted; the unit plate falls into a designated floor; transferring the unit plates between layers; mounting unit plates; the equipment installation in the step S1 comprises winch installation; mounting a cantilever lifting bracket and a fixed pulley; mounting floor pulleys; installing a cable wind rope; mounting a steel wire rope hanger; installing an electrical control system; the vertical transportation of the unit plates can be carried out through the curtain wall plate shaft vertical transportation technology, the construction method has the advantages of being economical, convenient and practical on the premise that safety is greatly guaranteed, and meanwhile the construction method achieves the effects of saving labor, materials and the construction period.
本发明属于建筑施工设备技术领域,具体的说是一种垂直运输系统的施工方法,根据施工场地实际情况完成设备安装,调试合格即可投入使用;准备阶段,进行准备提升工作;挂索阶段,将单元体进行挂索;提升阶段,对单元体进行提升;单元板块落入指定楼层;单元板块层间转运;单元板块安装;所述S1中提出的设备安装包括卷扬机安装;悬挑吊运支架及定滑轮安装;楼面滑轮安装;缆风绳安装;钢丝绳吊具安装;电气控制系统安装;本发明通过幕墙板块井道垂直运输技术可进行单元板块的垂直运输,能极大地在保证安全的前提下,具有经济、方便、实用的特点,同时本施工方法达到了节约人工、节约材料、节约工期的效果。
Construction method of vertical transportation system
The invention belongs to the technical field of building construction equipment, and particularly relates to a construction method of a vertical transportation system. Equipment installation is completed according to the actual situation of a construction site, and the equipment can be put into use after being debugged to be qualified; in the preparation stage, lifting preparation work is carried out; in the cable hanging stage, the unit bodies are subjected to cable hanging; in the lifting stage, the unit body is lifted; the unit plate falls into a designated floor; transferring the unit plates between layers; mounting unit plates; the equipment installation in the step S1 comprises winch installation; mounting a cantilever lifting bracket and a fixed pulley; mounting floor pulleys; installing a cable wind rope; mounting a steel wire rope hanger; installing an electrical control system; the vertical transportation of the unit plates can be carried out through the curtain wall plate shaft vertical transportation technology, the construction method has the advantages of being economical, convenient and practical on the premise that safety is greatly guaranteed, and meanwhile the construction method achieves the effects of saving labor, materials and the construction period.
本发明属于建筑施工设备技术领域,具体的说是一种垂直运输系统的施工方法,根据施工场地实际情况完成设备安装,调试合格即可投入使用;准备阶段,进行准备提升工作;挂索阶段,将单元体进行挂索;提升阶段,对单元体进行提升;单元板块落入指定楼层;单元板块层间转运;单元板块安装;所述S1中提出的设备安装包括卷扬机安装;悬挑吊运支架及定滑轮安装;楼面滑轮安装;缆风绳安装;钢丝绳吊具安装;电气控制系统安装;本发明通过幕墙板块井道垂直运输技术可进行单元板块的垂直运输,能极大地在保证安全的前提下,具有经济、方便、实用的特点,同时本施工方法达到了节约人工、节约材料、节约工期的效果。
Construction method of vertical transportation system
一种垂直运输系统的施工方法
ZHANG MINGYU (author) / SUN YANJUN (author) / YU BIN (author) / LIU LIJUN (author) / BAI YANYAN (author) / ZHAO CHANGFU (author) / CHEN JI (author) / HUANG JIE (author)
2022-03-11
Patent
Electronic Resource
Chinese
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Super-high-rise construction waste vertical transportation system
European Patent Office | 2020
|Prefabricated construction waste vertical transportation device
European Patent Office | 2024
|Vertical transportation device for cylindrical structure construction
European Patent Office | 2022
|Construction waste vertical transportation channel and using method thereof
European Patent Office | 2022
|