Positioning connecting piece for cast-in-place self-heat-preservation system and construction supporting system and construction method of positioning connecting piece
The invention discloses an on-site construction connecting piece of a steel wire mesh and insulation board composite structure and a construction supporting system and a construction method of the on-site construction connecting piece, and belongs to the technical field of buildings. The positioning connecting piece for the cast-in-place self-heat-preservation system comprises a connecting piece body. The steel wire mesh positioning piece is connected with the remaining section through a steel wire mesh positioning mechanism; the steel wire mesh positioning mechanism comprises a steel wire mesh positioning piece sleeving cavity penetrating through the inner and outer end faces and the lower surface of the steel wire mesh positioning piece; the plugging block is arranged at the upper part of the inner side of the sleeving cavity of the steel wire mesh positioning piece; the second steel wire mesh clamping groove is formed in the remaining section; the first inserting columns are arranged in the sleeving cavities of the steel wire mesh positioning pieces; and the steel wire mesh positioning piece positioning hole is formed in the remaining section. The steel wire mesh positioning piece, the first heat preservation plate positioning piece and the second heat preservation plate positioning piece are all directly pressed and clamped on the connecting piece body so that all structures can be fixed, binding is not needed, and the construction efficiency is improved.
本发明公开了一种钢丝网与保温板复合结构的现场施工连接件及其施工支撑体系、施工方法,属于建筑技术领域。所述用于现浇自保温体系的定位连接件包括:连接件本体;钢丝网定位件、第一保温板定位件和第二保温板定位件,钢丝网定位件通过钢丝网定位机构与留置段连接;钢丝网定位机构包括:贯穿钢丝网定位件内外端面及下表面的钢丝网定位件套接腔;设置在所述钢丝网定位件套接腔内侧上部的封堵块;开设在留置段上的第二钢丝网卡槽;设置在钢丝网定位件套接腔内的第一插接柱;开设在留置段上的钢丝网定位件定位孔。钢丝网定位件、第一保温板定位件和第二保温板定位件均是直接按压卡在连接件本体上即可实现各结构的固定,不需要绑扎,提高了施工效率。
Positioning connecting piece for cast-in-place self-heat-preservation system and construction supporting system and construction method of positioning connecting piece
The invention discloses an on-site construction connecting piece of a steel wire mesh and insulation board composite structure and a construction supporting system and a construction method of the on-site construction connecting piece, and belongs to the technical field of buildings. The positioning connecting piece for the cast-in-place self-heat-preservation system comprises a connecting piece body. The steel wire mesh positioning piece is connected with the remaining section through a steel wire mesh positioning mechanism; the steel wire mesh positioning mechanism comprises a steel wire mesh positioning piece sleeving cavity penetrating through the inner and outer end faces and the lower surface of the steel wire mesh positioning piece; the plugging block is arranged at the upper part of the inner side of the sleeving cavity of the steel wire mesh positioning piece; the second steel wire mesh clamping groove is formed in the remaining section; the first inserting columns are arranged in the sleeving cavities of the steel wire mesh positioning pieces; and the steel wire mesh positioning piece positioning hole is formed in the remaining section. The steel wire mesh positioning piece, the first heat preservation plate positioning piece and the second heat preservation plate positioning piece are all directly pressed and clamped on the connecting piece body so that all structures can be fixed, binding is not needed, and the construction efficiency is improved.
本发明公开了一种钢丝网与保温板复合结构的现场施工连接件及其施工支撑体系、施工方法,属于建筑技术领域。所述用于现浇自保温体系的定位连接件包括:连接件本体;钢丝网定位件、第一保温板定位件和第二保温板定位件,钢丝网定位件通过钢丝网定位机构与留置段连接;钢丝网定位机构包括:贯穿钢丝网定位件内外端面及下表面的钢丝网定位件套接腔;设置在所述钢丝网定位件套接腔内侧上部的封堵块;开设在留置段上的第二钢丝网卡槽;设置在钢丝网定位件套接腔内的第一插接柱;开设在留置段上的钢丝网定位件定位孔。钢丝网定位件、第一保温板定位件和第二保温板定位件均是直接按压卡在连接件本体上即可实现各结构的固定,不需要绑扎,提高了施工效率。
Positioning connecting piece for cast-in-place self-heat-preservation system and construction supporting system and construction method of positioning connecting piece
用于现浇自保温体系的定位连接件及其施工支撑体系、施工方法
WANG BO (author) / XIANG YANG (author) / WANG WENLONG (author) / CHEN XINGHUA (author) / CHEN XIAOJUN (author) / WANG XIAOTING (author)
2022-03-15
Patent
Electronic Resource
Chinese
European Patent Office | 2020
|European Patent Office | 2021
|Cast-in-place wall built-in heat preservation system limiting connecting piece
European Patent Office | 2021
|European Patent Office | 2021
|Formwork connecting piece for post-cast strip construction
European Patent Office | 2024
|