A platform for research: civil engineering, architecture and urbanism
Reinforcing system for large-scale landslide treatment and construction method thereof
The invention provides a reinforcing system for large-scale landslide treatment and a construction method thereof. The reinforcing system comprises composite assembly type open caissons arranged in a landslide body, and the evenly-distributed composite assembly type open caissons form a composite assembly type open caisson group; the lower portions of the composite assembly type open caisson groups are communicated through water collection and drainage culverts and jointly form a landslide mass drainage channel net, and finally the water is converged into the water collecting well to efficiently drain underground water in the landslide mass. Due to the fact that the interior of the open caisson is of a hollow structure, the reinforcing body can serve as a vertical drainage boundary of the slope body, water in the slope body can be effectively drained through the longitudinal drainage culvert and the transverse drainage culvert which are communicated with all the open caisson structures, and long-term safety and stability of the slope can be enhanced.
本发明提供了一种用于大型滑坡治理的加固体系及其施工方法,它包括设置在滑坡体内部的复合装配式沉井,均布的复合装配式沉井构成复合装配式沉井群;复合装配式沉井群的下部之间通过集排水涵洞相连通,并共同构成滑坡体排水通道网,并最终汇入至集水井将滑坡体内的地下水高效排出。由于沉井内部为空心结构,加固体可以作为坡体竖向排水边界,通过连通各沉井结构的纵横排水涵洞,可有效地将坡体内部水体排出,有助于增强边坡的长期安全稳定性。
Reinforcing system for large-scale landslide treatment and construction method thereof
The invention provides a reinforcing system for large-scale landslide treatment and a construction method thereof. The reinforcing system comprises composite assembly type open caissons arranged in a landslide body, and the evenly-distributed composite assembly type open caissons form a composite assembly type open caisson group; the lower portions of the composite assembly type open caisson groups are communicated through water collection and drainage culverts and jointly form a landslide mass drainage channel net, and finally the water is converged into the water collecting well to efficiently drain underground water in the landslide mass. Due to the fact that the interior of the open caisson is of a hollow structure, the reinforcing body can serve as a vertical drainage boundary of the slope body, water in the slope body can be effectively drained through the longitudinal drainage culvert and the transverse drainage culvert which are communicated with all the open caisson structures, and long-term safety and stability of the slope can be enhanced.
本发明提供了一种用于大型滑坡治理的加固体系及其施工方法,它包括设置在滑坡体内部的复合装配式沉井,均布的复合装配式沉井构成复合装配式沉井群;复合装配式沉井群的下部之间通过集排水涵洞相连通,并共同构成滑坡体排水通道网,并最终汇入至集水井将滑坡体内的地下水高效排出。由于沉井内部为空心结构,加固体可以作为坡体竖向排水边界,通过连通各沉井结构的纵横排水涵洞,可有效地将坡体内部水体排出,有助于增强边坡的长期安全稳定性。
Reinforcing system for large-scale landslide treatment and construction method thereof
一种用于大型滑坡治理的加固体系及其施工方法
XIANG XIN (author) / NIU YULONG (author) / SUN ZHIYU (author) / LI WENWEI (author) / LI JINGHUA (author)
2022-03-18
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Deep landslide body reinforcing structure and construction method thereof
European Patent Office | 2020
|Tunnel entrance and exit landslide mass reinforcing structure and construction method thereof
European Patent Office | 2024
|