A platform for research: civil engineering, architecture and urbanism
Converter station firewall construction process
The invention relates to a converter station firewall construction process. The converter station firewall construction process comprises the following steps: Step 1, firewall foundation construction: a firewall foundation trench is excavated; constructing a firewall foundation bed; binding firewall foundation steel bars; pouring firewall foundation concrete; curing the firewall foundation concrete; step 2, a firewall main body part construction step: binding a reinforcing mesh of the firewall main body part; a template of the firewall main body part is installed, the template comprises a plurality of template assemblies which are spliced from top to bottom, each template assembly comprises a plurality of template bodies which are sequentially connected in the horizontal direction, and each template body is provided with a movable vibration rod; and concrete is poured into the formwork in a layer-by-layer pouring mode. In the process of constructing the firewall through the formwork, concrete can be poured in a layered mode through the multiple formwork assemblies, and the concrete pouring quality can be guaranteed through layered pouring and layered vibrating.
本申请涉及一种换流站防火墙施工工艺,包括以下步骤:Step1、防火墙基础施工步骤:防火墙基槽开挖;防火墙基础垫层施工;防火墙基础钢筋绑扎;防火墙基础混凝土浇筑;防火墙基础混凝土养护;Step2、防火墙主体部分施工步骤:防火墙主体部分钢筋网绑扎;防火墙主体部分模板安装,模板包括多个自上而下拼接而成的模板组件,每个模板组件均包括多个沿水平方向依次相接的模板本体,在每个模板本体上均设置活动振动杆;采用逐层浇筑的方式向模板内浇筑混凝土。本申请在利用模板施工防火墙的过程中,多个模板组件可以使混凝土分层浇筑,分层浇筑与分层振捣可以保证混凝土浇筑的质量。
Converter station firewall construction process
The invention relates to a converter station firewall construction process. The converter station firewall construction process comprises the following steps: Step 1, firewall foundation construction: a firewall foundation trench is excavated; constructing a firewall foundation bed; binding firewall foundation steel bars; pouring firewall foundation concrete; curing the firewall foundation concrete; step 2, a firewall main body part construction step: binding a reinforcing mesh of the firewall main body part; a template of the firewall main body part is installed, the template comprises a plurality of template assemblies which are spliced from top to bottom, each template assembly comprises a plurality of template bodies which are sequentially connected in the horizontal direction, and each template body is provided with a movable vibration rod; and concrete is poured into the formwork in a layer-by-layer pouring mode. In the process of constructing the firewall through the formwork, concrete can be poured in a layered mode through the multiple formwork assemblies, and the concrete pouring quality can be guaranteed through layered pouring and layered vibrating.
本申请涉及一种换流站防火墙施工工艺,包括以下步骤:Step1、防火墙基础施工步骤:防火墙基槽开挖;防火墙基础垫层施工;防火墙基础钢筋绑扎;防火墙基础混凝土浇筑;防火墙基础混凝土养护;Step2、防火墙主体部分施工步骤:防火墙主体部分钢筋网绑扎;防火墙主体部分模板安装,模板包括多个自上而下拼接而成的模板组件,每个模板组件均包括多个沿水平方向依次相接的模板本体,在每个模板本体上均设置活动振动杆;采用逐层浇筑的方式向模板内浇筑混凝土。本申请在利用模板施工防火墙的过程中,多个模板组件可以使混凝土分层浇筑,分层浇筑与分层振捣可以保证混凝土浇筑的质量。
Converter station firewall construction process
换流站防火墙施工工艺
CUI HAIJUN (author) / ZHANG JIN (author) / ZHANG QIANG (author) / LI QIUZHANG (author) / CHENG LI (author)
2022-03-18
Patent
Electronic Resource
Chinese
Novel construction node of station electric room and firewall
European Patent Office | 2024
|