Large concrete funnel construction method
The invention relates to the field of embedded part installation, in particular to a large concrete funnel construction method. Comprising the following steps of measuring and positioning, erecting a supporting frame body, laying a lower bottom formwork, positioning and installing a bottom embedded plate, installing embedded part steel bars, welding a bottom anchor fluke, installing a side face embedded plate, installing a side face anchor fluke and performing concrete pouring construction. According to the method, the problems that in a traditional method, the positions of embedded part anchor claws and reinforcing steel bars are prone to conflict, and the positions of stirrups need to be modified multiple times are effectively solved, the working efficiency of construction is improved, the working period is shortened, and the construction cost is effectively reduced; during construction, the lengths of the bottom anchor flukes and the side anchor flukes do not need to be modified, the problem that the distance between stirrups is too large is solved, thermal deformation caused by lower portion welding and upper portion splicing is reduced, the installation quality is effectively improved, and the anchor flukes can be widely applied to the field of large concrete funnel construction on a construction site.
本发明涉及埋件安装领域,特别是涉及一种大型混凝土漏斗施工方法,包括如下步骤:测量定位→支撑架体搭设→铺设下底部模板→底部预埋板定位安装→埋件钢筋安装→焊接底部锚爪→安装侧面预埋板→安装侧面锚爪→混凝土浇筑施工;本方法有效避免了传统做法中埋件锚抓与钢筋位置容易发生冲突,需要多次修改箍筋位置的问题,提高了施工的工作效率,减少了作业周期,有效降低了施工造价成本;施工时无需修改底部锚爪和侧面锚爪的长度,避免了箍筋间距过大的问题,降低了下部焊接上部拼装引起的热变形,有效提高了安装质量,能够广泛应用于施工现场大型混凝土漏斗施工领域。
Large concrete funnel construction method
The invention relates to the field of embedded part installation, in particular to a large concrete funnel construction method. Comprising the following steps of measuring and positioning, erecting a supporting frame body, laying a lower bottom formwork, positioning and installing a bottom embedded plate, installing embedded part steel bars, welding a bottom anchor fluke, installing a side face embedded plate, installing a side face anchor fluke and performing concrete pouring construction. According to the method, the problems that in a traditional method, the positions of embedded part anchor claws and reinforcing steel bars are prone to conflict, and the positions of stirrups need to be modified multiple times are effectively solved, the working efficiency of construction is improved, the working period is shortened, and the construction cost is effectively reduced; during construction, the lengths of the bottom anchor flukes and the side anchor flukes do not need to be modified, the problem that the distance between stirrups is too large is solved, thermal deformation caused by lower portion welding and upper portion splicing is reduced, the installation quality is effectively improved, and the anchor flukes can be widely applied to the field of large concrete funnel construction on a construction site.
本发明涉及埋件安装领域,特别是涉及一种大型混凝土漏斗施工方法,包括如下步骤:测量定位→支撑架体搭设→铺设下底部模板→底部预埋板定位安装→埋件钢筋安装→焊接底部锚爪→安装侧面预埋板→安装侧面锚爪→混凝土浇筑施工;本方法有效避免了传统做法中埋件锚抓与钢筋位置容易发生冲突,需要多次修改箍筋位置的问题,提高了施工的工作效率,减少了作业周期,有效降低了施工造价成本;施工时无需修改底部锚爪和侧面锚爪的长度,避免了箍筋间距过大的问题,降低了下部焊接上部拼装引起的热变形,有效提高了安装质量,能够广泛应用于施工现场大型混凝土漏斗施工领域。
Large concrete funnel construction method
大型混凝土漏斗施工方法
SUI YUPENG (author) / YAO BIN (author) / ZHANG DONGJUN (author)
2022-03-18
Patent
Electronic Resource
Chinese
Large-diameter inverted-cone-shaped concrete funnel and inclined wall construction method thereof
European Patent Office | 2024
|Cast-in-place reinforced concrete silo funnel construction method
European Patent Office | 2023
|Concrete storage silo funnel structure and construction method thereof
European Patent Office | 2023
|