A platform for research: civil engineering, architecture and urbanism
Building material feeding device for road slope construction and using method of building material feeding device
The invention discloses a building material feeding device for road slope construction and a using method thereof.The building material feeding device comprises a first connecting frame, reinforcing ribs are arranged on the first connecting frame, the reinforcing ribs are connected with the first connecting frame through manual electric arc welding, and fixing pieces are arranged at the upper ends of the reinforcing ribs; the fixing piece is connected with the first connecting frame through manual arc welding, a driven roller is arranged at the front end of the fixing piece, the driven roller is rotationally connected with the fixing piece, the second connecting frame is arranged on one side of the first connecting frame, a connecting sleeve is arranged at the upper end of the second connecting frame, the connecting sleeve is arranged to be in an inverted concave shape, and the first connecting frame is connected with the second connecting frame. And the connecting sleeve is connected with the second connecting frame through a bolt, a driving roller is arranged on one side of the connecting sleeve, a motor is arranged at the front end of the driving roller, the motor is connected with the driving roller through a coupler, a transmission belt is arranged on the outer side of the driving roller, and the building materials are accurately put through the sliding rail.
本发明公开了一种公路边坡施工用建材上料装置及其使用方法,包括:第一连接架,所述第一连接架上设置有加强筋,所述加强筋与第一连接架通过手工电弧焊连接,所述加强筋的上端设置有固定片,所述固定片与第一连接架通过手工电弧焊连接,所述固定片的前端设置有从动辊,所述从动辊与固定片设置为转动连接,第二连接架,其设置在所述第一连接架的一侧,所述第二连接架的上端设置有连接套,所述连接套设置为倒“凹”状,所述连接套与第二连接架通过螺栓连接,所述连接套的一侧设置有主动辊,所述主动辊的前端设置有电机,且电机与主动辊通过联轴器连接,所述主动辊的外侧设置有传动带,其实现了通过滑轨来实现对建材进行精准投放的问题。
Building material feeding device for road slope construction and using method of building material feeding device
The invention discloses a building material feeding device for road slope construction and a using method thereof.The building material feeding device comprises a first connecting frame, reinforcing ribs are arranged on the first connecting frame, the reinforcing ribs are connected with the first connecting frame through manual electric arc welding, and fixing pieces are arranged at the upper ends of the reinforcing ribs; the fixing piece is connected with the first connecting frame through manual arc welding, a driven roller is arranged at the front end of the fixing piece, the driven roller is rotationally connected with the fixing piece, the second connecting frame is arranged on one side of the first connecting frame, a connecting sleeve is arranged at the upper end of the second connecting frame, the connecting sleeve is arranged to be in an inverted concave shape, and the first connecting frame is connected with the second connecting frame. And the connecting sleeve is connected with the second connecting frame through a bolt, a driving roller is arranged on one side of the connecting sleeve, a motor is arranged at the front end of the driving roller, the motor is connected with the driving roller through a coupler, a transmission belt is arranged on the outer side of the driving roller, and the building materials are accurately put through the sliding rail.
本发明公开了一种公路边坡施工用建材上料装置及其使用方法,包括:第一连接架,所述第一连接架上设置有加强筋,所述加强筋与第一连接架通过手工电弧焊连接,所述加强筋的上端设置有固定片,所述固定片与第一连接架通过手工电弧焊连接,所述固定片的前端设置有从动辊,所述从动辊与固定片设置为转动连接,第二连接架,其设置在所述第一连接架的一侧,所述第二连接架的上端设置有连接套,所述连接套设置为倒“凹”状,所述连接套与第二连接架通过螺栓连接,所述连接套的一侧设置有主动辊,所述主动辊的前端设置有电机,且电机与主动辊通过联轴器连接,所述主动辊的外侧设置有传动带,其实现了通过滑轨来实现对建材进行精准投放的问题。
Building material feeding device for road slope construction and using method of building material feeding device
公路边坡施工用建材上料装置及其使用方法
LI YING (author) / CAO YINTAO (author) / HAO YUZHOU (author) / CHEN LONG (author) / ZHANG JIANBIAO (author) / ZHANG CHENPENG (author) / ZHU BOXUAN (author) / XIE FENGJIAO (author) / ZHANG XUEHUAN (author) / LIU JIEXUAN (author)
2022-03-22
Patent
Electronic Resource
Chinese
Building material feeding device for fabricated building
European Patent Office | 2021
|Construction material feeding and conveying method for slope construction
European Patent Office | 2015
|Raw material feeding mechanical equipment based on building construction
European Patent Office | 2022
|