A platform for research: civil engineering, architecture and urbanism
River bank protection precast block supplementary throwing device and supplementary throwing method
The invention discloses a river bank protection precast block supplementary throwing device and method. According to an existing supplementary throwing mode, a crane and a lifting appliance are used for supplementary throwing, supplementary throwing time is long, efficiency is low, danger is caused, crane equipment cost is high, and time cost is very high. The device comprises a barge (7), a butt strap (4) is placed on the side, away from a working room (12), of the barge in the length direction, and a stabilizing structure is fixed to the butt strap and used for stabilizing the butt strap; two supplementary throwing winches (10) are placed on one side of a work room of the barge, and pulling block steel wire ropes (8) of the two supplementary throwing winches return to the supplementary throwing winches through guide pulleys (1) at the ends of the outer sides of the butt straps and are connected into a whole. The method is used for supplementing and throwing the river bank protection precast blocks.
河岸防护预制块补抛装置及补抛方法。目前的补抛方式是利用吊车,吊具补抛,补抛时间长、效率低、危险,吊车设备成本高,时间成本很高。本发明组成包括:驳船(7),在所述的驳船的长度方向远离工作房(12)的一侧放有搭板(4),所述的搭板上固定有稳定结构用于搭板的稳定;在所述的驳船的工作房一侧放置两台补抛卷扬机(10),两台所述的补抛卷扬机的拉块钢丝绳(8)通过所述的搭板外侧端头的导向滑轮(1)返回到所述的补抛卷扬机处并连接为一体。本发明用于河岸防护预制块补抛。
River bank protection precast block supplementary throwing device and supplementary throwing method
The invention discloses a river bank protection precast block supplementary throwing device and method. According to an existing supplementary throwing mode, a crane and a lifting appliance are used for supplementary throwing, supplementary throwing time is long, efficiency is low, danger is caused, crane equipment cost is high, and time cost is very high. The device comprises a barge (7), a butt strap (4) is placed on the side, away from a working room (12), of the barge in the length direction, and a stabilizing structure is fixed to the butt strap and used for stabilizing the butt strap; two supplementary throwing winches (10) are placed on one side of a work room of the barge, and pulling block steel wire ropes (8) of the two supplementary throwing winches return to the supplementary throwing winches through guide pulleys (1) at the ends of the outer sides of the butt straps and are connected into a whole. The method is used for supplementing and throwing the river bank protection precast blocks.
河岸防护预制块补抛装置及补抛方法。目前的补抛方式是利用吊车,吊具补抛,补抛时间长、效率低、危险,吊车设备成本高,时间成本很高。本发明组成包括:驳船(7),在所述的驳船的长度方向远离工作房(12)的一侧放有搭板(4),所述的搭板上固定有稳定结构用于搭板的稳定;在所述的驳船的工作房一侧放置两台补抛卷扬机(10),两台所述的补抛卷扬机的拉块钢丝绳(8)通过所述的搭板外侧端头的导向滑轮(1)返回到所述的补抛卷扬机处并连接为一体。本发明用于河岸防护预制块补抛。
River bank protection precast block supplementary throwing device and supplementary throwing method
河岸防护预制块补抛装置及补抛方法
WANG YUJIE (author) / CHEN WEI (author) / WU JUNGANG (author) / SUN LONGLONG (author) / HOU ZHAOTAO (author) / WANG QINGGUO (author)
2022-03-22
Patent
Electronic Resource
Chinese
Diving transition section precast block throwing and filling construction method
European Patent Office | 2024
|Sand throwing device for improving sand throwing precision
European Patent Office | 2024
|Underwater pillow bag throwing positioning method and throwing device
European Patent Office | 2023
|