A platform for research: civil engineering, architecture and urbanism
Repair treatment device and method for subsidence of soft saturated soil roadbed of expressway
According to the technical scheme, the device comprises an n-shaped plate, bases are symmetrically arranged at the bottom of the n-shaped plate, connecting blocks are symmetrically fixed to the front portion and the rear portion of the bottom of each base, the connecting blocks are connected with driving wheels through bearings, and the bottoms of the bases are connected with braking structures; the top of the n-shaped plate is connected with a height adjusting structure, the height adjusting structure is connected with a drilling structure, and the drilling structure is connected with grouting equipment. The treatment method comprises the following steps that firstly, an n-shaped plate is pushed, and a drilling structure is moved to the position needing to be repaired under the action of a driving wheel; and secondly, the braking structure makes contact with the ground, and the drilling structure is stably arranged above the position needing to be repaired. The method has the beneficial effects that drilling and grouting do not need to be carried out through different devices, continuous operation treatment can be carried out, the working intensity is reduced, and the repairing time is shortened.
本发明提供了一种高速公路软性的饱和土路基沉陷修复处理装置及方法,其技术方案为:包括n形板,n形板底部对称设有底座,底座底部前后对称固定有连接块,连接块通过轴承连接有驱动轮,底座底部连接有制动结构,n形板顶部连接有高度调节结构,高度调节结构连接有钻孔结构,钻孔结构连接有注浆设备;处理方法包括以下步骤:步骤一:推动n形板,在驱动轮作用下将钻孔结构移动至需要修复的位置处;步骤二:制动结构与地面接触好将钻孔结构稳定设在需要修复的位置处上方。本发明有益效果是:本发明钻孔和注浆无需通过不同设备进行操作的,可进行连续操作处理,降低了工作强度,缩短修复时间。
Repair treatment device and method for subsidence of soft saturated soil roadbed of expressway
According to the technical scheme, the device comprises an n-shaped plate, bases are symmetrically arranged at the bottom of the n-shaped plate, connecting blocks are symmetrically fixed to the front portion and the rear portion of the bottom of each base, the connecting blocks are connected with driving wheels through bearings, and the bottoms of the bases are connected with braking structures; the top of the n-shaped plate is connected with a height adjusting structure, the height adjusting structure is connected with a drilling structure, and the drilling structure is connected with grouting equipment. The treatment method comprises the following steps that firstly, an n-shaped plate is pushed, and a drilling structure is moved to the position needing to be repaired under the action of a driving wheel; and secondly, the braking structure makes contact with the ground, and the drilling structure is stably arranged above the position needing to be repaired. The method has the beneficial effects that drilling and grouting do not need to be carried out through different devices, continuous operation treatment can be carried out, the working intensity is reduced, and the repairing time is shortened.
本发明提供了一种高速公路软性的饱和土路基沉陷修复处理装置及方法,其技术方案为:包括n形板,n形板底部对称设有底座,底座底部前后对称固定有连接块,连接块通过轴承连接有驱动轮,底座底部连接有制动结构,n形板顶部连接有高度调节结构,高度调节结构连接有钻孔结构,钻孔结构连接有注浆设备;处理方法包括以下步骤:步骤一:推动n形板,在驱动轮作用下将钻孔结构移动至需要修复的位置处;步骤二:制动结构与地面接触好将钻孔结构稳定设在需要修复的位置处上方。本发明有益效果是:本发明钻孔和注浆无需通过不同设备进行操作的,可进行连续操作处理,降低了工作强度,缩短修复时间。
Repair treatment device and method for subsidence of soft saturated soil roadbed of expressway
一种高速公路软性的饱和土路基沉陷修复处理装置及方法
XING BANGNING (author) / YANG FAN (author) / XIN HAINAN (author) / ZHANG QINGYIN (author) / GAO CHAO (author) / HOU DENGGAO (author) / DAI XIN (author) / ZHANG NINGNING (author) / HAN HONG (author) / WEI MIAN (author)
2022-03-25
Patent
Electronic Resource
Chinese
Expressway soft soil roadbed settlement observation cable device
European Patent Office | 2023
|Construction method for anti-settlement expressway roadbed in soft soil area
European Patent Office | 2022
|