A platform for research: civil engineering, architecture and urbanism
The invention belongs to the technical field of hydropower stations, and particularly relates to an onshore serial hydropower station, drained water of a previous power station is used as inlet water of a next power station, each power station uses the same water head, the same onshore structure and the same installed capacity to generate the same amount of electricity, a series of power stations repeatedly use the same water body in a serial mode, and the onshore serial hydropower station is formed. The generator set of each power station is built on the land along the river, one end of the water delivery channel is connected into the upstream water inlet pool of the river or the drainage receiving pool of the previous power station, the other end of the water delivery channel is communicated with the generator set on the land along the river through a vertical pipe, and the vertical height of the vertical pipe meets the water head required by power generation. The power station is easy in site selection and low in manufacturing cost, water resources can be recycled, the water fall of each meter can be developed, and the water energy utilization rate is greatly increased.
本发明属于水电站技术领域,具体涉及一种陆上连环水电站,上一电站的排水用作下一电站的进水,每座电站都用相同的水头,相同的陆上结构和同样装机容量发出同样多的电,一连串电站连环重复使用同一水体,形成沿岸陆上连环水电站。每座电站的发电机组建设在沿河陆地上,其输水通道一端接入河流上游来水口池中或者上一电站的排水承接池中、另一端通过立管与沿河陆上发电机组连通,所述立管垂直高度满足发电所需水头。本发明电站选址容易、造价低、可重复利用水资源,能开发每一米水落差,大大提高水能利用率。
The invention belongs to the technical field of hydropower stations, and particularly relates to an onshore serial hydropower station, drained water of a previous power station is used as inlet water of a next power station, each power station uses the same water head, the same onshore structure and the same installed capacity to generate the same amount of electricity, a series of power stations repeatedly use the same water body in a serial mode, and the onshore serial hydropower station is formed. The generator set of each power station is built on the land along the river, one end of the water delivery channel is connected into the upstream water inlet pool of the river or the drainage receiving pool of the previous power station, the other end of the water delivery channel is communicated with the generator set on the land along the river through a vertical pipe, and the vertical height of the vertical pipe meets the water head required by power generation. The power station is easy in site selection and low in manufacturing cost, water resources can be recycled, the water fall of each meter can be developed, and the water energy utilization rate is greatly increased.
本发明属于水电站技术领域,具体涉及一种陆上连环水电站,上一电站的排水用作下一电站的进水,每座电站都用相同的水头,相同的陆上结构和同样装机容量发出同样多的电,一连串电站连环重复使用同一水体,形成沿岸陆上连环水电站。每座电站的发电机组建设在沿河陆地上,其输水通道一端接入河流上游来水口池中或者上一电站的排水承接池中、另一端通过立管与沿河陆上发电机组连通,所述立管垂直高度满足发电所需水头。本发明电站选址容易、造价低、可重复利用水资源,能开发每一米水落差,大大提高水能利用率。
Land serial hydropower station
一种陆上连环水电站
ZHANG LICHENG (author)
2022-03-25
Patent
Electronic Resource
Chinese
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
British Library Conference Proceedings | 2018
|