Semi-underground transformer substation with combined structure
The invention provides a combined structure semi-underground transformer substation which comprises an underground structure and an overground structure which are connected with each other, the underground structure adopts a reinforced concrete structure, and the overground structure adopts a fabricated steel structure; wherein the overground structure comprises a steel structure column, a beam and a floor slab; the steel structure column adopts a box-shaped section column; the beam adopts H-shaped steel; the floor slab adopts a profiled steel sheet as a template for pouring concrete. By means of the construction method, the problems that an existing semi-underground substation is long in construction period, large in field wet construction amount, large in influence on the surrounding environment and difficult to control in-situ pouring and machining quality can be solved.
本发明提供一种组合结构半地下变电站,其包括互连的地下结构和地上结构,地下结构采用钢筋混凝土结构,地上结构采用装配式钢结构;其中,地上结构包括钢结构柱、梁和楼板;钢结构柱采用箱形截面柱;梁采用H型钢;楼板采用压型钢板为模板浇灌混凝土。实施本发明,能解决现有半地下变电站施工周期较长,现场湿作业多,对周围环境影响大,以及现场浇筑及加工质量较难把控的问题。
Semi-underground transformer substation with combined structure
The invention provides a combined structure semi-underground transformer substation which comprises an underground structure and an overground structure which are connected with each other, the underground structure adopts a reinforced concrete structure, and the overground structure adopts a fabricated steel structure; wherein the overground structure comprises a steel structure column, a beam and a floor slab; the steel structure column adopts a box-shaped section column; the beam adopts H-shaped steel; the floor slab adopts a profiled steel sheet as a template for pouring concrete. By means of the construction method, the problems that an existing semi-underground substation is long in construction period, large in field wet construction amount, large in influence on the surrounding environment and difficult to control in-situ pouring and machining quality can be solved.
本发明提供一种组合结构半地下变电站,其包括互连的地下结构和地上结构,地下结构采用钢筋混凝土结构,地上结构采用装配式钢结构;其中,地上结构包括钢结构柱、梁和楼板;钢结构柱采用箱形截面柱;梁采用H型钢;楼板采用压型钢板为模板浇灌混凝土。实施本发明,能解决现有半地下变电站施工周期较长,现场湿作业多,对周围环境影响大,以及现场浇筑及加工质量较难把控的问题。
Semi-underground transformer substation with combined structure
一种组合结构半地下变电站
GONG GUOJUN (author) / FU GUOHUI (author) / WEI BO (author) / JIANG XIAODONG (author) / PENG PENG (author) / ZHOU YAMIN (author) / LI FUQUAN (author) / LUO ZHANBIAO (author) / SU WEIPING (author) / HUANG SHUZHEN (author)
2022-04-01
Patent
Electronic Resource
Chinese
Underground drainage device of compartment type transformer substation
European Patent Office | 2022
|Electric power combined type transformer substation house
European Patent Office | 2015
|