A platform for research: civil engineering, architecture and urbanism
Waterproof curtain ultra-deep diaphragm wall joint box and construction method
The invention relates to a waterproof curtain ultra-deep diaphragm wall joint box and a construction method, solves the problems that in the prior art, a wall body is difficult to be tightly connected, the joint box is difficult to lift after concrete streaming and hardening, and the box body is easy to damage in the lift process, and has the advantages that the joint area is large, and the box body is convenient to lift and is not easy to damage. The joint box comprises a joint box body, the joint box body comprises main body square steel, small square steel is arranged on one side of the main body square steel, an arc steel plate is arranged on the other side of the main body square steel, a thickened steel plate is arranged on the surface of the main body square steel, carrying pole holes are evenly formed in the main body square steel, and steel carrying poles are inserted into the carrying pole holes step by step. A connector box connector is arranged at the upper end of the connector box body, and a connecting mechanism is arranged on the arc steel plate.
本发明为一种截水帷幕超深防渗墙接头箱及施工方法,其克服了现有技术中存在的墙体难以密接,混凝土绕流硬化后接头箱难以顶拔且顶拔过程中箱体易破坏的问题,本发明接缝面积大,箱体顶拔方便,不易破坏。本发明包括接头箱箱体,接头箱箱体包括主体方钢,主体方钢的一侧设置有小方钢,主体方钢的另一侧设置有圆弧钢板,主体方钢的表面设置有加厚钢板,扁担孔均匀布置于主体方钢内部,钢扁担逐级插入扁担孔,接头箱箱体上端设置有接头箱接头,圆弧钢板上设置有连接机构。
Waterproof curtain ultra-deep diaphragm wall joint box and construction method
The invention relates to a waterproof curtain ultra-deep diaphragm wall joint box and a construction method, solves the problems that in the prior art, a wall body is difficult to be tightly connected, the joint box is difficult to lift after concrete streaming and hardening, and the box body is easy to damage in the lift process, and has the advantages that the joint area is large, and the box body is convenient to lift and is not easy to damage. The joint box comprises a joint box body, the joint box body comprises main body square steel, small square steel is arranged on one side of the main body square steel, an arc steel plate is arranged on the other side of the main body square steel, a thickened steel plate is arranged on the surface of the main body square steel, carrying pole holes are evenly formed in the main body square steel, and steel carrying poles are inserted into the carrying pole holes step by step. A connector box connector is arranged at the upper end of the connector box body, and a connecting mechanism is arranged on the arc steel plate.
本发明为一种截水帷幕超深防渗墙接头箱及施工方法,其克服了现有技术中存在的墙体难以密接,混凝土绕流硬化后接头箱难以顶拔且顶拔过程中箱体易破坏的问题,本发明接缝面积大,箱体顶拔方便,不易破坏。本发明包括接头箱箱体,接头箱箱体包括主体方钢,主体方钢的一侧设置有小方钢,主体方钢的另一侧设置有圆弧钢板,主体方钢的表面设置有加厚钢板,扁担孔均匀布置于主体方钢内部,钢扁担逐级插入扁担孔,接头箱箱体上端设置有接头箱接头,圆弧钢板上设置有连接机构。
Waterproof curtain ultra-deep diaphragm wall joint box and construction method
一种截水帷幕超深防渗墙接头箱及施工方法
WEI YONGSHENG (author) / ZHANG YAN (author) / GUO JINGZHONG (author) / WANG HAI (author) / TENG QINGSHAN (author) / TIAN ZENGLIN (author) / LI SANCHUAN (author) / NIU GUANGLIANG (author) / ZHANG QIUYUAN (author) / ZHU HONGJUN (author)
2022-04-05
Patent
Electronic Resource
Chinese
Leakage plugging construction method for diaphragm wall joint with waterproof curtain on outer side
European Patent Office | 2023
|Underground diaphragm wall joint waterproof construction method and waterproof structure
European Patent Office | 2023
|Waterproof construction method for joint of GRC curtain wall and glass curtain wall
European Patent Office | 2020
|Underground diaphragm wall joint structure and waterproof construction method thereof
European Patent Office | 2023
|