A platform for research: civil engineering, architecture and urbanism
Method for water-saving buried seepage pipe for field crops
The invention discloses a method for water-saving burying of a seepage pipe for field crops. The method comprises the following steps: step 1, planning and marking; step 2, peripheral arrangement; thirdly, earth excavation is conducted; step 4, constructing a base layer; 5, laying a seepage pipe; step 6, pre-burying and backfilling; 7, marking and inserting; according to the method, the V-shaped flow guide plate is laid at the bottom of the seepage pipe earthwork, water flow seeping from the seepage pipe can be conveniently guided to the two sides of the plate after burying is completed, then the water-saving capacity of the buried seepage pipe is ensured, the pre-buried frame is inserted into the top of the buried pipe base layer, and a fault excavated in a crop field is reinforced; according to the underground seepage pipe laying device, the collapse phenomenon in the seepage pipe laying process is prevented, then the seepage pipe laying quality is ensured, the seepage pipe laying efficiency is improved, the marking rod is inserted into the top of the pipe laying layer, the burying position of the seepage pipe is marked, the labor intensity for replacing the underground seepage pipe is reduced, and the underground seepage pipe can be conveniently managed and planned in the later period.
本发明公开了一种大田作物节水地埋渗管的方法,包括以下步骤:步骤一,规划标记;步骤二,外围布设;步骤三,土方开挖;步骤四,基层搭建;步骤五,渗管铺设;步骤六,预埋回填;步骤七,标记安插;本发明,通过在渗管土方的底部铺设V型导流板,在地埋完成后便于将渗管中渗出的水流导向板材的两侧,进而确保了埋设后渗管的节水能力,通过在埋管基层的顶部插放预埋架,对作物大田开挖的断层进行加固处理,防止在铺设渗管的过程中出现坍塌现象,进而确保了渗管铺设的质量,提高了渗管铺设的效率,通过在埋管层的顶部插入标记杆,对渗管的埋设位置进行标记,降低了更换地埋渗管的劳动强度,便于后期对地埋渗管进行管理和规划。
Method for water-saving buried seepage pipe for field crops
The invention discloses a method for water-saving burying of a seepage pipe for field crops. The method comprises the following steps: step 1, planning and marking; step 2, peripheral arrangement; thirdly, earth excavation is conducted; step 4, constructing a base layer; 5, laying a seepage pipe; step 6, pre-burying and backfilling; 7, marking and inserting; according to the method, the V-shaped flow guide plate is laid at the bottom of the seepage pipe earthwork, water flow seeping from the seepage pipe can be conveniently guided to the two sides of the plate after burying is completed, then the water-saving capacity of the buried seepage pipe is ensured, the pre-buried frame is inserted into the top of the buried pipe base layer, and a fault excavated in a crop field is reinforced; according to the underground seepage pipe laying device, the collapse phenomenon in the seepage pipe laying process is prevented, then the seepage pipe laying quality is ensured, the seepage pipe laying efficiency is improved, the marking rod is inserted into the top of the pipe laying layer, the burying position of the seepage pipe is marked, the labor intensity for replacing the underground seepage pipe is reduced, and the underground seepage pipe can be conveniently managed and planned in the later period.
本发明公开了一种大田作物节水地埋渗管的方法,包括以下步骤:步骤一,规划标记;步骤二,外围布设;步骤三,土方开挖;步骤四,基层搭建;步骤五,渗管铺设;步骤六,预埋回填;步骤七,标记安插;本发明,通过在渗管土方的底部铺设V型导流板,在地埋完成后便于将渗管中渗出的水流导向板材的两侧,进而确保了埋设后渗管的节水能力,通过在埋管基层的顶部插放预埋架,对作物大田开挖的断层进行加固处理,防止在铺设渗管的过程中出现坍塌现象,进而确保了渗管铺设的质量,提高了渗管铺设的效率,通过在埋管层的顶部插入标记杆,对渗管的埋设位置进行标记,降低了更换地埋渗管的劳动强度,便于后期对地埋渗管进行管理和规划。
Method for water-saving buried seepage pipe for field crops
一种大田作物节水地埋渗管的方法
LIU DAGUANG (author)
2022-04-12
Patent
Electronic Resource
Chinese
European Patent Office | 2024
|Basement exterior wall pre-buried casing pipe seepage-proofing construction method
European Patent Office | 2021
|Energy-saving anti-seepage mechanism of water drain pipe for water pollution control
European Patent Office | 2021
|Fabricated wood structure buried pipe energy-saving wall
European Patent Office | 2022
|