Tunnel lining double-trolley maintenance construction method suitable for alpine region
The tunnel lining double-trolley maintenance construction method suitable for the alpine region comprises the steps that a, after secondary lining concrete is demolded, a secondary lining formwork trolley moves forwards to a next pouring station, and a constant-temperature and constant-humidity steam-curing trolley moves to a next steam-curing station; b, after the constant-temperature and constant-humidity steam-curing trolley reaches a steam-curing station, a telescopic temperature real-time monitoring device monitors the internal temperature of the lining in real time, and it is ensured that a steam-curing water constant-temperature device stabilizes steam-curing water within the range of the internal temperature of the lining +/-15 DEG C; c, fixing the constant-temperature and constant-humidity steam-curing trolley at a steam-curing station to perform secondary lining steam-curing, and meanwhile, enabling the back-and-forth spraying and curing trolley to perform back-and-forth spraying and curing on all sections of which the curing age does not reach the standard behind the secondary lining concrete steam-curing station; and d, after demolding of the secondary lining formwork trolley is completed, the steps a-c are repeated, and maintenance construction continues to be conducted forwards. The maintenance quality of secondary lining concrete can be improved, time is saved, and the construction equipment cost is reduced.
本发明公开了一种适用于高寒地区的隧道衬砌双台车养护施工方法,步骤a、二次衬砌混凝土脱模后,二衬模板台车前移至下一浇筑工位,恒温恒湿蒸养台车行走至下一蒸养工位;步骤b、当恒温恒湿蒸养台车到达蒸养工位后,伸缩式温度实时监测装置实时监测衬砌内部温度,确保蒸养用水恒温装置将蒸养用水稳定在衬砌内部温度±15℃范围内;步骤c,恒温恒湿蒸养台车固定在蒸养工位进行二衬蒸养的同时,往返喷淋跟养台车往返于二衬砌混凝土蒸养工位后方的养护龄期未达标的所有段落,进行往返喷淋养护;步骤d,待二衬模板台车脱模完成后,重复步骤a~c继续向前进行养护施工。能提高二衬混凝土的养护质量,节约时间,降低施工设备成本。
Tunnel lining double-trolley maintenance construction method suitable for alpine region
The tunnel lining double-trolley maintenance construction method suitable for the alpine region comprises the steps that a, after secondary lining concrete is demolded, a secondary lining formwork trolley moves forwards to a next pouring station, and a constant-temperature and constant-humidity steam-curing trolley moves to a next steam-curing station; b, after the constant-temperature and constant-humidity steam-curing trolley reaches a steam-curing station, a telescopic temperature real-time monitoring device monitors the internal temperature of the lining in real time, and it is ensured that a steam-curing water constant-temperature device stabilizes steam-curing water within the range of the internal temperature of the lining +/-15 DEG C; c, fixing the constant-temperature and constant-humidity steam-curing trolley at a steam-curing station to perform secondary lining steam-curing, and meanwhile, enabling the back-and-forth spraying and curing trolley to perform back-and-forth spraying and curing on all sections of which the curing age does not reach the standard behind the secondary lining concrete steam-curing station; and d, after demolding of the secondary lining formwork trolley is completed, the steps a-c are repeated, and maintenance construction continues to be conducted forwards. The maintenance quality of secondary lining concrete can be improved, time is saved, and the construction equipment cost is reduced.
本发明公开了一种适用于高寒地区的隧道衬砌双台车养护施工方法,步骤a、二次衬砌混凝土脱模后,二衬模板台车前移至下一浇筑工位,恒温恒湿蒸养台车行走至下一蒸养工位;步骤b、当恒温恒湿蒸养台车到达蒸养工位后,伸缩式温度实时监测装置实时监测衬砌内部温度,确保蒸养用水恒温装置将蒸养用水稳定在衬砌内部温度±15℃范围内;步骤c,恒温恒湿蒸养台车固定在蒸养工位进行二衬蒸养的同时,往返喷淋跟养台车往返于二衬砌混凝土蒸养工位后方的养护龄期未达标的所有段落,进行往返喷淋养护;步骤d,待二衬模板台车脱模完成后,重复步骤a~c继续向前进行养护施工。能提高二衬混凝土的养护质量,节约时间,降低施工设备成本。
Tunnel lining double-trolley maintenance construction method suitable for alpine region
适用于高寒地区的隧道衬砌双台车养护施工方法
XIONG JUN (author) / WANG YUANQING (author) / DENG JUN (author) / ZHANG PAN (author) / HU JIALING (author) / FANG BING (author) / HE MINGSHI (author) / PU KUN (author) / WEI XINGCHUN (author) / LUO YONG (author)
2022-04-12
Patent
Electronic Resource
Chinese
IPC:
C04B
Kalk
,
LIME
Rail climbing device of tunnel lining construction trolley
European Patent Office | 2024
|Dual-mode lining trolley and open cut tunnel construction method
European Patent Office | 2023
|