A platform for research: civil engineering, architecture and urbanism
The invention discloses a quick discharging device during railway construction, which comprises a front discharging part with a brake mechanism, the front discharging part is connected with a rear discharging part, and the quick discharging device is structurally characterized in that a feeding channel is arranged on the front discharging part, the front end of the feeding channel is connected with a material guide channel which is arranged in a forward inclined manner and penetrates through the bottom surface of the front discharging part, and the rear end of the feeding channel is connected with a material guide rod. A horizontal separation part of the crawler belt conveying mechanism is arranged in the feeding channel, the front end of the horizontal separation part is connected with a material guide plate located in the material guide channel, and an arrangement head located in front of the material guide plate is connected to the lower portion of the front discharging part; the sleeper taking device has the beneficial effects that the sleepers and the material supporting frame are separated by the horizontal separation part, so that the sleepers enter the material guiding channel, the material supporting frame enters the material returning channel, then the material supporting frame is conveyed to the material returning space on the rear position material part to wait to be taken away, the material taking stroke of the sleepers is shortened through the reciprocating motion, and the material taking efficiency is improved. Therefore, the spreading efficiency is improved.
本发明公开了一种铁路施工时的快速排料装置,包括具有制动机构的前位排料部,前位排料部连接有后位置料部,其结构要点是,前位排料部上设置有进料通道,进料通道的前端连接有向前倾斜设置且将前位排料部的底面贯穿的导料通道,进料通道内设置有履带传送机构的水平分隔部,水平分隔部的前端连接有位于导料通道内的导料板,前位排料部的下方连接有位于导料板的前方的排列头;本发明的有益效果是:轨枕和托料架被水平分隔部进行分隔,从而使轨枕进入导料通道内,托料架进入回料通道内,然后将托料架输送至后位置料部上的回料空间内等待取走,如此往复运动,就缩短了对轨枕的取料行程,从而增加了铺料的效率。
The invention discloses a quick discharging device during railway construction, which comprises a front discharging part with a brake mechanism, the front discharging part is connected with a rear discharging part, and the quick discharging device is structurally characterized in that a feeding channel is arranged on the front discharging part, the front end of the feeding channel is connected with a material guide channel which is arranged in a forward inclined manner and penetrates through the bottom surface of the front discharging part, and the rear end of the feeding channel is connected with a material guide rod. A horizontal separation part of the crawler belt conveying mechanism is arranged in the feeding channel, the front end of the horizontal separation part is connected with a material guide plate located in the material guide channel, and an arrangement head located in front of the material guide plate is connected to the lower portion of the front discharging part; the sleeper taking device has the beneficial effects that the sleepers and the material supporting frame are separated by the horizontal separation part, so that the sleepers enter the material guiding channel, the material supporting frame enters the material returning channel, then the material supporting frame is conveyed to the material returning space on the rear position material part to wait to be taken away, the material taking stroke of the sleepers is shortened through the reciprocating motion, and the material taking efficiency is improved. Therefore, the spreading efficiency is improved.
本发明公开了一种铁路施工时的快速排料装置,包括具有制动机构的前位排料部,前位排料部连接有后位置料部,其结构要点是,前位排料部上设置有进料通道,进料通道的前端连接有向前倾斜设置且将前位排料部的底面贯穿的导料通道,进料通道内设置有履带传送机构的水平分隔部,水平分隔部的前端连接有位于导料通道内的导料板,前位排料部的下方连接有位于导料板的前方的排列头;本发明的有益效果是:轨枕和托料架被水平分隔部进行分隔,从而使轨枕进入导料通道内,托料架进入回料通道内,然后将托料架输送至后位置料部上的回料空间内等待取走,如此往复运动,就缩短了对轨枕的取料行程,从而增加了铺料的效率。