A platform for research: civil engineering, architecture and urbanism
Building construction foundation land tamping equipment
The invention relates to land tamping equipment, in particular to building construction foundation land tamping equipment. The invention provides building construction foundation land tamping equipment capable of automatically filling up mud pits. The building construction foundation land tamping equipment comprises a first supporting frame, first rotating shafts, first wheels, a first supporting plate, a first gear motor, a first contact switch and the like, the first rotating shafts are rotationally arranged on the front side and the rear side of the lower portion of the left side of the first supporting frame correspondingly, and the first wheels are arranged on the outer sides of the first rotating shafts correspondingly; a first gear motor is arranged on the left side in the first supporting plate, and a first contact switch is arranged in the middle of the rear side of the top of the first supporting frame. According to the device, soil is poured into the storage box, and when the first movable plate is aligned with a mud pit on the ground, the soil in the storage box can fall into the mud pit, so that the mud pit is automatically filled, and the working efficiency of people is improved.
本发明涉及一种土地夯实设备,尤其涉及一种建筑施工地基土地夯实设备。本发明提供一种能够自动填补泥坑的建筑施工地基土地夯实设备。本发明提供了这样一种建筑施工地基土地夯实设备,包括有第一支撑架、第一转轴、第一车轮、第一支撑板、第一减速电机、第一接触开关等,第一支撑架左侧下部的前后两侧均转动式设有第一转轴,第一转轴外侧均设有第一车轮,第一支撑架左侧下部设有第一支撑板,第一支撑板内部左侧设有第一减速电机,第一支撑架顶部后侧中部设有第一接触开关。本发明将泥土倒入储存箱内,在第一活动板与地面上的泥坑对齐时,能够使储存箱内的泥土掉落至泥坑内,从而自动对泥坑进行填补,提高人们的工作效率。
Building construction foundation land tamping equipment
The invention relates to land tamping equipment, in particular to building construction foundation land tamping equipment. The invention provides building construction foundation land tamping equipment capable of automatically filling up mud pits. The building construction foundation land tamping equipment comprises a first supporting frame, first rotating shafts, first wheels, a first supporting plate, a first gear motor, a first contact switch and the like, the first rotating shafts are rotationally arranged on the front side and the rear side of the lower portion of the left side of the first supporting frame correspondingly, and the first wheels are arranged on the outer sides of the first rotating shafts correspondingly; a first gear motor is arranged on the left side in the first supporting plate, and a first contact switch is arranged in the middle of the rear side of the top of the first supporting frame. According to the device, soil is poured into the storage box, and when the first movable plate is aligned with a mud pit on the ground, the soil in the storage box can fall into the mud pit, so that the mud pit is automatically filled, and the working efficiency of people is improved.
本发明涉及一种土地夯实设备,尤其涉及一种建筑施工地基土地夯实设备。本发明提供一种能够自动填补泥坑的建筑施工地基土地夯实设备。本发明提供了这样一种建筑施工地基土地夯实设备,包括有第一支撑架、第一转轴、第一车轮、第一支撑板、第一减速电机、第一接触开关等,第一支撑架左侧下部的前后两侧均转动式设有第一转轴,第一转轴外侧均设有第一车轮,第一支撑架左侧下部设有第一支撑板,第一支撑板内部左侧设有第一减速电机,第一支撑架顶部后侧中部设有第一接触开关。本发明将泥土倒入储存箱内,在第一活动板与地面上的泥坑对齐时,能够使储存箱内的泥土掉落至泥坑内,从而自动对泥坑进行填补,提高人们的工作效率。
Building construction foundation land tamping equipment
一种建筑施工地基土地夯实设备
ZHONG JINHUI (author)
2022-04-12
Patent
Electronic Resource
Chinese
Building construction foundation tamping construction technology
European Patent Office | 2024
|