A platform for research: civil engineering, architecture and urbanism
Pile casing-free reinforcing method for super-long dug hole in high fill area and grouting device of pile casing-free reinforcing method
The invention relates to a pile casing-free reinforcing method for an ultra-long dug hole in a high fill area and a grouting device thereof. The method comprises the following steps: step 1, measuring and positioning; the positions of grouting holes are drilled through a jumbolter, the jumbolter conducts subsurface excavation in the miscellaneous fill stratum area, after the grouting holes are formed, grouting pipes extend into the grouting holes, then grouting is conducted, and after grouting is completed, drilling and grouting of the next grouting hole are conducted until drilling and grouting of all the grouting holes are completed; 3, rotary digging and hole forming are conducted, specifically, hole digging operation is conducted on the pile foundation position through an anchor rod drilling machine; fourthly, a reinforcement cage is placed, wherein the reinforcement cage is placed in the pile foundation hole site; concrete is poured into a pile foundation hole site, so that a pile foundation is formed; and 6, maintenance is conducted. The method has the advantages that in the hole digging process, the peripheral structural strength is improved, the hole collapse phenomenon is avoided, meanwhile, the construction difficulty is lowered, the hole wall stability is guaranteed, and the hole forming efficiency and the pile foundation quality are improved.
本发明涉及一种高填方区超长挖孔免护筒式加固方法及其注浆装置,步骤一:测量定位;步骤二:压密注浆:通过锚杆钻机对注浆孔位置进行钻孔,锚杆钻机在杂填土层区域进行潜挖,形成注浆孔后将注浆管伸入,然后实施注浆,完成注浆后,转入下一个注浆孔的钻挖注浆,直至所有注浆孔钻挖注浆完毕;步骤三:旋挖成孔:通过锚杆钻机对桩基位置进行挖孔操作;步骤四:钢筋笼安放:将钢筋笼放置与桩基孔位内;浇筑成桩:将混凝土灌入到桩基孔位内,使得桩基成型;步骤六:养护。本发明具有提高挖孔过程中,外周的结构强度、避免出现塌孔现象、同时降低施工难度、确保孔壁稳定,提高成孔效率和桩基质量等特点。
Pile casing-free reinforcing method for super-long dug hole in high fill area and grouting device of pile casing-free reinforcing method
The invention relates to a pile casing-free reinforcing method for an ultra-long dug hole in a high fill area and a grouting device thereof. The method comprises the following steps: step 1, measuring and positioning; the positions of grouting holes are drilled through a jumbolter, the jumbolter conducts subsurface excavation in the miscellaneous fill stratum area, after the grouting holes are formed, grouting pipes extend into the grouting holes, then grouting is conducted, and after grouting is completed, drilling and grouting of the next grouting hole are conducted until drilling and grouting of all the grouting holes are completed; 3, rotary digging and hole forming are conducted, specifically, hole digging operation is conducted on the pile foundation position through an anchor rod drilling machine; fourthly, a reinforcement cage is placed, wherein the reinforcement cage is placed in the pile foundation hole site; concrete is poured into a pile foundation hole site, so that a pile foundation is formed; and 6, maintenance is conducted. The method has the advantages that in the hole digging process, the peripheral structural strength is improved, the hole collapse phenomenon is avoided, meanwhile, the construction difficulty is lowered, the hole wall stability is guaranteed, and the hole forming efficiency and the pile foundation quality are improved.
本发明涉及一种高填方区超长挖孔免护筒式加固方法及其注浆装置,步骤一:测量定位;步骤二:压密注浆:通过锚杆钻机对注浆孔位置进行钻孔,锚杆钻机在杂填土层区域进行潜挖,形成注浆孔后将注浆管伸入,然后实施注浆,完成注浆后,转入下一个注浆孔的钻挖注浆,直至所有注浆孔钻挖注浆完毕;步骤三:旋挖成孔:通过锚杆钻机对桩基位置进行挖孔操作;步骤四:钢筋笼安放:将钢筋笼放置与桩基孔位内;浇筑成桩:将混凝土灌入到桩基孔位内,使得桩基成型;步骤六:养护。本发明具有提高挖孔过程中,外周的结构强度、避免出现塌孔现象、同时降低施工难度、确保孔壁稳定,提高成孔效率和桩基质量等特点。
Pile casing-free reinforcing method for super-long dug hole in high fill area and grouting device of pile casing-free reinforcing method
一种高填方区超长挖孔免护筒式加固方法及其注浆装置
LIU ZHICHENG (author) / ZHANG ANFANG (author) / WANG JINHUA (author) / SONG KAI (author)
2022-04-12
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
European Patent Office | 2015
|European Patent Office | 2023
|High-pressure jet grouting pile grouting structure reinforcing device
European Patent Office | 2024
|High-pressure jet grouting pile grouting structure reinforcing device
European Patent Office | 2023
|Pile casing mounting device and pile casing mounting method
European Patent Office | 2023
|