A platform for research: civil engineering, architecture and urbanism
Bridge erecting machine
The invention provides a bridge girder erection machine which comprises a machine body frame, a walking device and a hole guiding and piling device, the walking device and the hole guiding and piling device are suitable for being arranged on the machine body frame, and the walking device is suitable for driving the machine body frame to walk; the hole guiding and piling device comprises a supporting beam assembly, a hole guiding mechanism and a piling mechanism, wherein the hole guiding mechanism and the piling mechanism are suitable for being arranged on the supporting beam assembly, and the supporting beam assembly is suitable for moving on the machine body frame. According to the bridge erecting machine, by arranging the hole guiding and piling device, the hole guiding mechanism and the piling mechanism are integrated on the bridge erecting machine, so that the bridge erecting machine is suitable for not only carrying out beam erecting operation, but also carrying out drilling operation and piling operation, and the number of construction machines in bridge erecting operation is reduced; the bridge erecting machine can be arranged on the erected bridge part for construction in the bridge erecting operation, construction machinery does not need to be arranged by arranging a ship or a construction road, the difficulty and cost of the bridge erecting operation are reduced, and the adverse effect of construction of the bridge erecting machine on the ecological environment is reduced.
本发明提供了一种架桥机,包括机身框架和适于设置在所述机身框架上的走行装置和引孔打桩装置,所述走行装置适于驱动所述机身框架走行;所述引孔打桩装置包括支撑梁总成和适于设置在所述支撑梁总成上的引孔机构和打桩机构,且所述支撑梁总成适于在所述机身框架上移动。本发明的架桥机通过设置引孔打桩装置,以将引孔机构和打桩机构集成到架桥机上,使得架桥机不仅适于进行架梁作业,还适于进行钻孔作业和打桩作业,减少了架桥作业中施工机械的数量,使得架桥作业中架桥机可以设置在架设完成的桥梁部分上进行施工,而无需通过设置船舶或施工便道来布置施工机械,降低了架桥作业的难度与成本以及架桥机施工对生态环境造成的不利影响。
Bridge erecting machine
The invention provides a bridge girder erection machine which comprises a machine body frame, a walking device and a hole guiding and piling device, the walking device and the hole guiding and piling device are suitable for being arranged on the machine body frame, and the walking device is suitable for driving the machine body frame to walk; the hole guiding and piling device comprises a supporting beam assembly, a hole guiding mechanism and a piling mechanism, wherein the hole guiding mechanism and the piling mechanism are suitable for being arranged on the supporting beam assembly, and the supporting beam assembly is suitable for moving on the machine body frame. According to the bridge erecting machine, by arranging the hole guiding and piling device, the hole guiding mechanism and the piling mechanism are integrated on the bridge erecting machine, so that the bridge erecting machine is suitable for not only carrying out beam erecting operation, but also carrying out drilling operation and piling operation, and the number of construction machines in bridge erecting operation is reduced; the bridge erecting machine can be arranged on the erected bridge part for construction in the bridge erecting operation, construction machinery does not need to be arranged by arranging a ship or a construction road, the difficulty and cost of the bridge erecting operation are reduced, and the adverse effect of construction of the bridge erecting machine on the ecological environment is reduced.
本发明提供了一种架桥机,包括机身框架和适于设置在所述机身框架上的走行装置和引孔打桩装置,所述走行装置适于驱动所述机身框架走行;所述引孔打桩装置包括支撑梁总成和适于设置在所述支撑梁总成上的引孔机构和打桩机构,且所述支撑梁总成适于在所述机身框架上移动。本发明的架桥机通过设置引孔打桩装置,以将引孔机构和打桩机构集成到架桥机上,使得架桥机不仅适于进行架梁作业,还适于进行钻孔作业和打桩作业,减少了架桥作业中施工机械的数量,使得架桥作业中架桥机可以设置在架设完成的桥梁部分上进行施工,而无需通过设置船舶或施工便道来布置施工机械,降低了架桥作业的难度与成本以及架桥机施工对生态环境造成的不利影响。
Bridge erecting machine
一种架桥机
HU XUDONG (author) / SHEN CHAO (author) / LI ZHENXI (author) / HE SHUIBING (author) / ZHANG CHUANXING (author) / ZHENG GUO (author) / LI WEILONG (author) / LIU JUNSHENG (author) / MA TAI (author) / ZHU BING (author)
2022-04-22
Patent
Electronic Resource
Chinese
Bridge erecting method and bridge erecting machine for realizing the bridge erecting method
European Patent Office | 2020
|Bridge erecting machine for erecting small-radius bridge
European Patent Office | 2021
|Multifunctional bridge erecting machine and bridge erecting construction method
European Patent Office | 2022
|