Shaftway pre-embedded structure and steel structure building construction method
The invention provides a hoistway pre-embedded structure and a steel structure building construction method. The hoistway pre-embedded structure comprises a bottom plate, a plurality of supporting columns and a plurality of supporting columns, one side of the lap joint plate is connected to the bottom plate, the other side of the lap joint plate extends upwards, and the edge of the lap joint plate is provided with a lap joint edge; and the fixing structure is arranged on the bottom plate. The fixing structure is fixed on the bottom plate, and the bottom plate is pre-buried, so that the method that a profiled steel sheet truss and steel bars are firstly cut, then a sleeve is placed, and repair welding reinforcement is carried out is replaced, the structural load bearing is further prevented from being damaged, and the reserved pre-burying construction time is effectively shortened.
本发明提供一种井道预埋结构及钢结构建筑施工方法,井道预埋结构包括:底板;搭接板,搭接板的一侧连接在底板上,另一侧朝向上方延伸,搭接板的边沿处设置有搭接边沿;固定结构,设置在所述底板上。通过将固定结构固定在底板上,并将底板进行预埋,从而替代了先进行切割压型钢板行架、钢筋的方式,再放入套管,进行补焊加强的方法,进一步的避免破坏结构承重,并有效的降低预留预埋施工时长。
Shaftway pre-embedded structure and steel structure building construction method
The invention provides a hoistway pre-embedded structure and a steel structure building construction method. The hoistway pre-embedded structure comprises a bottom plate, a plurality of supporting columns and a plurality of supporting columns, one side of the lap joint plate is connected to the bottom plate, the other side of the lap joint plate extends upwards, and the edge of the lap joint plate is provided with a lap joint edge; and the fixing structure is arranged on the bottom plate. The fixing structure is fixed on the bottom plate, and the bottom plate is pre-buried, so that the method that a profiled steel sheet truss and steel bars are firstly cut, then a sleeve is placed, and repair welding reinforcement is carried out is replaced, the structural load bearing is further prevented from being damaged, and the reserved pre-burying construction time is effectively shortened.
本发明提供一种井道预埋结构及钢结构建筑施工方法,井道预埋结构包括:底板;搭接板,搭接板的一侧连接在底板上,另一侧朝向上方延伸,搭接板的边沿处设置有搭接边沿;固定结构,设置在所述底板上。通过将固定结构固定在底板上,并将底板进行预埋,从而替代了先进行切割压型钢板行架、钢筋的方式,再放入套管,进行补焊加强的方法,进一步的避免破坏结构承重,并有效的降低预留预埋施工时长。
Shaftway pre-embedded structure and steel structure building construction method
一种井道预埋结构及钢结构建筑施工方法
FENG QIANG (author) / ZHANG YINWANG (author) / PENG BAILIN (author) / QIAO XIAOBING (author) / JING CHUNPEI (author) / CHEN HUA (author) / ZHANG FALIN (author) / REN YANLIN (author)
2022-04-22
Patent
Electronic Resource
Chinese
Embedded joint of steel structure building and construction method
European Patent Office | 2023
|Steel structure building elevator construction method and steel structure building elevator
European Patent Office | 2021
|European Patent Office | 2021
|