A platform for research: civil engineering, architecture and urbanism
Ecological revetment for water conservancy project and construction method of ecological revetment
The invention relates to the field of ecological revetments, in particular to an ecological revetment for a water conservancy project and a construction method of the ecological revetment. The bottom plate is placed in the engineering groove, and a sleeve is arranged on the hole wall of the through hole a; the bottom of the cylinder is inserted into soil; one end of the inserting rod is contacted with the periphery of the cone b, and the other end punctures the plastic lantern ring; the cone b is arranged at the bottom of the cylinder; a knob is arranged at the top of the vertical rod; a plurality of groups of ground gripping assemblies are arranged; an inserting block a is arranged at the bottom of the slope block and inserted into the strip-shaped groove a, and a flat plate a and a U-shaped plate are arranged at the top and the bottom of the left side end face of the slope block correspondingly. And the splicing plates are inserted into the strip-shaped grooves b, inserting blocks b are arranged on the splicing plates, and the inserting blocks b are inserted into the U-shaped plates in a matched mode. In the invention, the road holding force of the bottom plate is strong, the overall assembly is simple and convenient, and finally, the stability of the overall structure can be further enhanced through concrete pouring and soil filling.
本发明涉及生态护岸领域,具体为一种用于水利工程的生态护岸及其施工方法,其包括抓地组件、斜面块和拼接板;底板放置在工程槽内,通孔a孔壁上设置套管;筒体底部插入土壤内;插杆一端与圆锥b外周接触,插杆另一端刺破塑料套环;圆锥b设置在圆柱底部;竖杆设置在圆柱顶部,竖杆顶部设置旋钮;抓地组件设置多组;斜面块底部设置插接块a,插接块a插入条形槽a内,斜面块左侧端面顶部和底部分别设置平板a和U型板;拼接板插入条形槽b内,拼接板上设置插接块b,插接块b配合插入U型板内。本发明中,底板的抓地力强,且整体组装简单方便,最后通过混凝土浇筑和土壤填充能进一步加强整体结构的稳定性。
Ecological revetment for water conservancy project and construction method of ecological revetment
The invention relates to the field of ecological revetments, in particular to an ecological revetment for a water conservancy project and a construction method of the ecological revetment. The bottom plate is placed in the engineering groove, and a sleeve is arranged on the hole wall of the through hole a; the bottom of the cylinder is inserted into soil; one end of the inserting rod is contacted with the periphery of the cone b, and the other end punctures the plastic lantern ring; the cone b is arranged at the bottom of the cylinder; a knob is arranged at the top of the vertical rod; a plurality of groups of ground gripping assemblies are arranged; an inserting block a is arranged at the bottom of the slope block and inserted into the strip-shaped groove a, and a flat plate a and a U-shaped plate are arranged at the top and the bottom of the left side end face of the slope block correspondingly. And the splicing plates are inserted into the strip-shaped grooves b, inserting blocks b are arranged on the splicing plates, and the inserting blocks b are inserted into the U-shaped plates in a matched mode. In the invention, the road holding force of the bottom plate is strong, the overall assembly is simple and convenient, and finally, the stability of the overall structure can be further enhanced through concrete pouring and soil filling.
本发明涉及生态护岸领域,具体为一种用于水利工程的生态护岸及其施工方法,其包括抓地组件、斜面块和拼接板;底板放置在工程槽内,通孔a孔壁上设置套管;筒体底部插入土壤内;插杆一端与圆锥b外周接触,插杆另一端刺破塑料套环;圆锥b设置在圆柱底部;竖杆设置在圆柱顶部,竖杆顶部设置旋钮;抓地组件设置多组;斜面块底部设置插接块a,插接块a插入条形槽a内,斜面块左侧端面顶部和底部分别设置平板a和U型板;拼接板插入条形槽b内,拼接板上设置插接块b,插接块b配合插入U型板内。本发明中,底板的抓地力强,且整体组装简单方便,最后通过混凝土浇筑和土壤填充能进一步加强整体结构的稳定性。
Ecological revetment for water conservancy project and construction method of ecological revetment
一种用于水利工程的生态护岸及其施工方法
LI CAIHONG (author) / WANG HAILONG (author) / LEI MEIDE (author) / WANG FEI (author)
2022-04-26
Patent
Electronic Resource
Chinese
Ecological revetment for water conservancy project and construction method of ecological revetment
European Patent Office | 2024
|Ecological revetment for water conservancy project and construction method thereof
European Patent Office | 2021
|Water conservancy project seawall revetment ecological transformation structure
European Patent Office | 2021
|