A platform for research: civil engineering, architecture and urbanism
Drilling and pouring device and method for dam reinforcement
The invention relates to the technical field of water conservancy projects, and aims to solve the problems that the compaction degree of concrete between a finished column and a hole wall is not enough in the pouring process when dam reinforcement is performed on the finished column through existing equipment and operation is performed through the existing equipment, so that the dam reinforcement degree is low, and the construction cost is low. The drilling and pouring device comprises a three-way pipe, the three-way pipe is connected with the output end of a stirring tank through a first one-way valve, the three-way pipe is connected with the output end of an air pump through a second one-way valve, and the output end of the three-way pipe is connected with a pouring pipe of a finished column; and a cover body; the center tightening mechanism is arranged on the cover body; the material uniformizing mechanism is arranged on the cover body; according to the concrete conveying device, the concrete conveying force can be increased, the internal structure of concrete can be made to be tighter through continuous vibration, and the reinforcing effect on a dam is improved.
本发明涉及水利工程技术领域,针对通过现有设备对成品柱在进行堤坝加固作用并通过现有设备作业时,会存在浇筑过程中处于成品柱和孔壁之间的混凝土紧实程度不够,从而导致堤坝加固程度较低,具体是涉及一种堤坝加固用钻孔浇筑装置及其方法,包括有三通管,三通管通过第一单向阀与搅拌罐的输出端连接,三通管通过第二单向阀与气泵的输出端连接,三通管的输出端与成品柱的灌注管连接;以及罩体;以及中心收紧机构,中心收紧机构设置于罩体上;以及匀料机构,匀料机构设置于罩体上;以及升降机构,罩体设置于升降机构的输出端,通过本申请可以加速对混凝土的输送力度,还可以不断的振动促使混泥土的内部结构更加紧密,提高了对堤坝的加固效果。
Drilling and pouring device and method for dam reinforcement
The invention relates to the technical field of water conservancy projects, and aims to solve the problems that the compaction degree of concrete between a finished column and a hole wall is not enough in the pouring process when dam reinforcement is performed on the finished column through existing equipment and operation is performed through the existing equipment, so that the dam reinforcement degree is low, and the construction cost is low. The drilling and pouring device comprises a three-way pipe, the three-way pipe is connected with the output end of a stirring tank through a first one-way valve, the three-way pipe is connected with the output end of an air pump through a second one-way valve, and the output end of the three-way pipe is connected with a pouring pipe of a finished column; and a cover body; the center tightening mechanism is arranged on the cover body; the material uniformizing mechanism is arranged on the cover body; according to the concrete conveying device, the concrete conveying force can be increased, the internal structure of concrete can be made to be tighter through continuous vibration, and the reinforcing effect on a dam is improved.
本发明涉及水利工程技术领域,针对通过现有设备对成品柱在进行堤坝加固作用并通过现有设备作业时,会存在浇筑过程中处于成品柱和孔壁之间的混凝土紧实程度不够,从而导致堤坝加固程度较低,具体是涉及一种堤坝加固用钻孔浇筑装置及其方法,包括有三通管,三通管通过第一单向阀与搅拌罐的输出端连接,三通管通过第二单向阀与气泵的输出端连接,三通管的输出端与成品柱的灌注管连接;以及罩体;以及中心收紧机构,中心收紧机构设置于罩体上;以及匀料机构,匀料机构设置于罩体上;以及升降机构,罩体设置于升降机构的输出端,通过本申请可以加速对混凝土的输送力度,还可以不断的振动促使混泥土的内部结构更加紧密,提高了对堤坝的加固效果。
Drilling and pouring device and method for dam reinforcement
一种堤坝加固用钻孔浇筑装置及其方法
ZHANG XIAOGANG (author) / ZOU RUI (author) / YANG JIAN (author) / SHEN WEIDUO (author) / PENG QIN (author) / CHEN YAN (author) / QUE ZHONGQI (author) / HUANG WEN (author) / GUO WEI (author) / GAO JIE (author)
2022-05-10
Patent
Electronic Resource
Chinese
Reinforcement cage positioning device and reinforcement cage pouring method
European Patent Office | 2024
|Flow plastic sludge layer drilling wall protection method, pouring method and pouring structure
European Patent Office | 2020
|