A platform for research: civil engineering, architecture and urbanism
Fabricated corrugated steel connecting structure for comprehensive pipe gallery
The invention discloses a corrugated steel connecting structure for an assembly type comprehensive pipe gallery, relates to the technical field of urban road engineering, solves the problems of uneven settlement, rapid construction, economical efficiency improvement and the like of the urban road comprehensive pipe gallery, and abandons the traditional mode of wet joint connection and settlement joint arrangement of the assembly type pipe gallery. A novel assembly type comprehensive pipe rack corrugated steel connecting mode is adopted, and the assembly type comprehensive pipe rack corrugated (shaped) steel connecting structure comprises a transverse corrugated steel rigid bearing system, a longitudinal corrugated steel fold flexible system, a corrugated steel and comprehensive pipe rack connecting system, an assembly type comprehensive pipe rack pre-buried connecting structure system and a corrugated steel splicing system. The problems of waterproofness, differential settlement, slab staggering and the like of the settlement joint of the pipe gallery can be solved, the construction period can be greatly shortened, investment can be saved, meanwhile, the problems of overall transportation difficulty and the like of large pieces can be solved by adopting factory manufacturing and on-site assembling schemes, on-site construction can be greatly reduced, urban pollution can be effectively reduced, and the environmental protection requirement can be improved.
本发明公开了一种装配式综合管廊波纹形钢连接结构,涉及城市道路工程技术领域,解决了城市道路综合管廊不均匀沉降、快速施工、提高经济性等问题,本发明摒弃了传统装配式管廊湿接缝连接并设置沉降缝的方式,采用新型装配式综合管廊波纹形钢连接方式,装配式综合管廊波纹(形)钢连接结构包括横向波纹形钢刚性承重体系、纵向波纹形钢褶皱柔性体系、波纹形钢与综合管廊连接体系、装配式综合管廊预埋连接结构体系、波纹形钢拼接体系。本发明可以解决管廊沉降缝防水、不均匀沉降错台等问题,可大幅减小施工工期、节约投资,同时可采用工厂制作、现场拼装方案解决了大件整体运输困难等问题,还可大大减小现场施工,有效减小城市污染,提高环保要求。
Fabricated corrugated steel connecting structure for comprehensive pipe gallery
The invention discloses a corrugated steel connecting structure for an assembly type comprehensive pipe gallery, relates to the technical field of urban road engineering, solves the problems of uneven settlement, rapid construction, economical efficiency improvement and the like of the urban road comprehensive pipe gallery, and abandons the traditional mode of wet joint connection and settlement joint arrangement of the assembly type pipe gallery. A novel assembly type comprehensive pipe rack corrugated steel connecting mode is adopted, and the assembly type comprehensive pipe rack corrugated (shaped) steel connecting structure comprises a transverse corrugated steel rigid bearing system, a longitudinal corrugated steel fold flexible system, a corrugated steel and comprehensive pipe rack connecting system, an assembly type comprehensive pipe rack pre-buried connecting structure system and a corrugated steel splicing system. The problems of waterproofness, differential settlement, slab staggering and the like of the settlement joint of the pipe gallery can be solved, the construction period can be greatly shortened, investment can be saved, meanwhile, the problems of overall transportation difficulty and the like of large pieces can be solved by adopting factory manufacturing and on-site assembling schemes, on-site construction can be greatly reduced, urban pollution can be effectively reduced, and the environmental protection requirement can be improved.
本发明公开了一种装配式综合管廊波纹形钢连接结构,涉及城市道路工程技术领域,解决了城市道路综合管廊不均匀沉降、快速施工、提高经济性等问题,本发明摒弃了传统装配式管廊湿接缝连接并设置沉降缝的方式,采用新型装配式综合管廊波纹形钢连接方式,装配式综合管廊波纹(形)钢连接结构包括横向波纹形钢刚性承重体系、纵向波纹形钢褶皱柔性体系、波纹形钢与综合管廊连接体系、装配式综合管廊预埋连接结构体系、波纹形钢拼接体系。本发明可以解决管廊沉降缝防水、不均匀沉降错台等问题,可大幅减小施工工期、节约投资,同时可采用工厂制作、现场拼装方案解决了大件整体运输困难等问题,还可大大减小现场施工,有效减小城市污染,提高环保要求。
Fabricated corrugated steel connecting structure for comprehensive pipe gallery
一种装配式综合管廊波纹形钢连接结构
LU SANPING (author) / LI CONGLIN (author) / HU DONGYANG (author) / CHEN KEJIAN (author) / LI CHONGJIE (author) / SU BO (author) / ZHOU KUN (author) / YANG YEXIN (author) / CHEN GUOJIE (author) / ZHOU XIAOYANG (author)
2022-05-10
Patent
Electronic Resource
Chinese
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of corrugated steel comprehensive pipe gallery
European Patent Office | 2020
|